NR NR/L2/INI/CP0043 ISSUE 3 PDF

NR NR/L2/INI/CP0043 ISSUE 3 PDF

Name:
NR NR/L2/INI/CP0043 ISSUE 3 PDF

Published Date:
12/01/2008

Status:
[ Inactive ]

Description:

Management of Third Party Works on Network Rail Infrastructure (aka NR/SP/OHS/043)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE * PDF ONLY

The scope of Network Rail's responsibilities in this standard is to discharge its duties as Infrastructure Manager in accordance with the Railways and Other Guided Transportation Systems (Safety) Regulations 2006 (ROGS) as defined in its Safety Management System.

This Standard specifies the minimum requirements that apply to all Third Party Works carried out on Network Rail's Managed Infrastructure.

NOTE - Examples of Third Party Works may include:

Small, localised schemes (eg new siding connected to an existing line and where there is a consequential alteration to Network Rail's Managed Iinfrastructure) funded and undertaken by a train operator;

Medium-sized schemes (eg new station) funded and undertaken by a local Passenger Transport Executive (PTE) or County Council; or private developer where the assets created will be managed and operated by Network Rail under its Health and Safety Management System.

Large, nationally significant schemes (eg main line upgrade) funded and specified by the Department for Transport (Dft), Transport Scotland or the Welsh Assembly under development or framework agreements with those parties, and/or their nominees

Purpose

Network Rail's arrangements for the safe management and delivery of its infrastructure projects are described in the Network Rail Health and Safety Management System, section 4.2 "Safe Delivery of Core Activities" as applicable.

This Standard sets out requirements for the application of equivalent controls to be established when external bodies (herein referred to as "Third Parties") wish to specify, manage and/or deliver infrastructure projects upon Network Rail's Managed Infrastructure, and where the works is on the Network Rail Managed Infrastructure, a Network Rail licensed Principal Contractor is employed.

Central to these arrangements are the appointment of nominated representatives for both Network Rail and the Third Party, the development of robust Agreements between the parties as to what is to be done, and the role of each party in achieving it.


Edition : 3
File Size : 1 file , 220 KB
Number of Pages : 26
Published : 12/01/2008

History


Related products

NR RT/SIN/086 ISSUE 2
Published Date: 10/01/2003
Set-Up a Maintenance of Hardlock Nuts on Corus RT60 Layouts with Adjustable Stretcher Bars
$13.2
NR NR/L2/SIG/30009 ISSUE 25
Published Date: 06/03/2023
Signalling Principles Handbook
$13.2
NR NR/L3/MTC/SG0019 ISSUE 2
Published Date: 08/26/2008
Failure Escalation of Servo Type Hot Axle Bearing Detectors (HABD) Equipment
$13.2
NR SSI8003-102F ISSUE 1
Published Date: 12/01/2002
SSI Data Preparation - Core Data for Level Crossings - Bi-Directional Track - One Signal - Chapter F: Stopping/Non-Stopping & Call-By Plunger (aka RT/SSI/8003-102F)
$5.7

Best-Selling Products

JEDEC EIA 318-B
Published Date: 07/01/1996
MEASUREMENT OF REVERSE RECOVERY TIME FOR SEMICONDUCTOR SIGNAL DIODES
$17.7
JEDEC EIA 323 (R2002)
Published Date: 03/01/1966
AIR-CONVECTION-COOLED, LIFE TEST ENVIRONMENT FOR LEAD-MOUNTED SEMICONDUCTOR DEVICES
$15.3
JEDEC EIA 365 (R1984)
Published Date: 11/01/1969
PERFORMANCE TEST PROCEDURE FOR SOLAR CELLS AND CALIBRATION PROCEDURE FOR SOLAR CELL STANDARDS FOR SPACE VEHICLE SERVICE
$17.7
JEDEC EIA 397-1
Published Date: 07/01/1980
ADDENDUM No. 1 TO EIA-397
$31.8
JEDEC EIA 397
Published Date: 06/01/1972
RECOMMENDED STANDARD FOR THYRISTORS
$68.4
JEDEC EIA 557B
Published Date: 02/01/2006
STATISTICAL PROCESS CONTROL SYSTEMS
$22.2