NR NR/L2/NDS/202 ISSUE 5 PDF

NR NR/L2/NDS/202 ISSUE 5 PDF

Name:
NR NR/L2/NDS/202 ISSUE 5 PDF

Published Date:
12/04/2010

Status:
[ Revised ]

Description:

Engineering Access & NDS-Supplied Resource Planning

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
SUPERSEDED BY NR/L2/OPS/202

This standard applies to Operations & Customer Services (O&CS), National Delivery Services (NDS), Investment Projects, Asset Management - Renewals and Infrastructure Maintenance (and all contractors working on behalf of each NR function) when applying for engineering access on the railway infrastructure. It applies to NDS, responsible for granting and coordinating engineering access and to O&CS, responsible for managing the Network Rail interface with Train Operators.

Resource planning refers to those resources supplied by NDS. It includes the planning of engineering trains and on-track machines for maintenance, renewals and investment projects activity but not the train timing of these. It does not cover the planning and timing of WTT and amended train services for Network Rail's passenger and freight customers.

This standard does not mandate the detail of how work plans are developed within Network Rail functions. Infrastructure Maintenance, Asset Management – Renewals (AM-R) and Investment Projects (IP) each have their own detailed work planning standards and process documents, compatible with the timescale and quality requirements contained in this standard.

Purpose

This standard describes the principles, key activities, timescales and required work plan information quality applicable to the planning of access and resources to support the delivery of maintenance, renewals and enhancement works on the railway infrastructure.


Edition : 5
File Size : 1 file , 290 KB
Number of Pages : 40
Published : 12/04/2010

History

NR NR/L2/OPS/202 ISSUE 7
Published Date: 06/03/2017
Principles, Timescales and Functional Responsibilities for Engineering Work, Access and Heavy Resource Planning (formerly NR/L2/NDS/202)
$18.6
NR NR/L2/NDS/202 ISSUE 6
Published Date: 03/03/2012
Principles, Timescales and Functional Responsibilities for Engineering Work, Access and Heavy Resource Planning
$18.6
NR NR/L2/NDS/202 ISSUE 5
Published Date: 12/04/2010
Engineering Access & NDS-Supplied Resource Planning
$18.6

Related products

NR NR/CIV/SD/328 ISSUE C
Published Date: 09/02/2017
Earthwork Drains: Headwall: H1 Limited Design Life / Temporary Repair
$5.7
NR BRS-SM 440/M4 ISSUE C
Published Date: 08/08/1994
Signalling Equipment Framework M8 Fixings for Signalling Equipment on Channel Rails
$5.7
NR NR/SMTH/PART 02 ISSUE 13
Published Date: 12/02/2023
Signal Maintenance Testing Handbook (SMTH): Part 02
$24.3
NR NR/CIV/SD/2225-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details Capping Slab for 7.4m Span Right Skew 45° Curved Deck
$5.7

Best-Selling Products