NR NR/L2/NDS/202 ISSUE 6 PDF

NR NR/L2/NDS/202 ISSUE 6 PDF

Name:
NR NR/L2/NDS/202 ISSUE 6 PDF

Published Date:
03/03/2012

Status:
[ Revised ]

Description:

Principles, Timescales and Functional Responsibilities for Engineering Work, Access and Heavy Resource Planning

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
SUPERSEDED BY NR/L2/NDS/202

This standard applies to Network Operations (NO), National Delivery Services (NDS), Asset Management Renewals (AMR), Investment Projects (IP) and all contractors working on behalf of each NR function when planning engineering access on the railway infrastructure. Maintenance activities are referred to as NO (Infrastructure Maintenance) in this standard.

It includes the planning of engineering trains and on-track machines for maintenance, renewal and enhancement activity but not the timetabling of these. It does not include the planning and timing of WTT and amended train services for Network Rail's passenger and freight customers.

This standard does not mandate the detail of how work, engineering access, and resource plans are developed within Network Rail functions. NO, NDS, AMR and IP each have their own detailed planning standards and/or functional procedures, compatible with the timescale and quality requirements contained in this standard.

Purpose

This standard describes the principles, key activities, timescales and required work plan information quality applicable to the planning of physical works, engineering access, and resources to support the delivery of maintenance, renewal and enhancement works on the railway infrastructure.


Edition : 6
File Size : 1 file , 430 KB
Number of Pages : 42
Published : 03/03/2012

History

NR NR/L2/OPS/202 ISSUE 7
Published Date: 06/03/2017
Principles, Timescales and Functional Responsibilities for Engineering Work, Access and Heavy Resource Planning (formerly NR/L2/NDS/202)
$18.6
NR NR/L2/NDS/202 ISSUE 6
Published Date: 03/03/2012
Principles, Timescales and Functional Responsibilities for Engineering Work, Access and Heavy Resource Planning
$18.6
NR NR/L2/NDS/202 ISSUE 5
Published Date: 12/04/2010
Engineering Access & NDS-Supplied Resource Planning
$18.6

Related products

NR NR/L3/TRK/1015/MOD02 ISSUE 4
Published Date: 12/04/2021
Management of Basic Visual Inspection: Plain Line Pattern Recognition - Introduction and Support
$13.2
NR NR/CIV/SD/615 ISSUE E
Published Date: 09/02/2017
Modular Staging: Typical Foundations Details
$5.7
NR BRS-SM 3105/1 ISSUE 1
Published Date: 02/07/2007
HPSS Point Layout NR60 F Layout HPSA Fitted in Cess on Right Hand Side
$5.7
NR BRS-SM 571/2 ISSUE B
Published Date: 02/18/1994
Swing Nose Crossing Retaining Support Bar for Drive Lock Mechanism
$5.7

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants