NR NR/L2/OHS/00112 ISSUE 3 PDF

NR NR/L2/OHS/00112 ISSUE 3 PDF

Name:
NR NR/L2/OHS/00112 ISSUE 3 PDF

Published Date:
09/05/2020

Status:
[ Active ]

Description:

Worksafe procedure

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This business process details the process for work groups / employees to deal with immediate safety problems.

It applies to:

a) all Network Rail business functions and all Network Rail employees;

b) all staff employed by Network Rail or its contractors through the Supply Chain Operations or Capital Delivery.

NOTE: If there is no immediate risk to safety and the employee does not think it necessary to instigate the worksafe procedure, two other options are available:

a) Close Calls contactable via telephone on 01908 723500 or the App.

b) CIRAS is an alternative method of confidentially raising a safety concern to the respective management level. “CIRAS can be contacted by telephone on 0800 4 101 101, by text message to 07507 285 887 or in writing to "Freepost CIRAS".

The CIRAS office is open from 09:00 to 17:00 Monday to Friday. A message may be left with contact details outside these hours. One of the CIRAS team will arrange to call back at a time to suit.

Purpose

This business process:

a) enables work groups / employees to feel confident that if they have genuine concerns about the safety of a task or a system of work, their concerns will be given serious consideration and they will not face recriminations.

b) allows for work to stop if there is a potential or imminent risk of an accident or incident arising;

c) can be applied for example, by a work group / employee if they are asked to undertake a task without the required training, equipment or personal protective equipment, or if there are no adequate risk controls in the task briefing or safe system of work in place.

NOTE: This list is not exhaustive. The Network Rail Worksafe Procedure Policy Statement is in appendix A.


Edition : 3
File Size : 2 files , 1.1 MB
Number of Pages : 16
Published : 09/05/2020

History

NR NR/L2/OHS/00112 ISSUE 3
Published Date: 09/05/2020
Worksafe procedure
$13.2
NR NR/L2/OHS/00112 ISSUE 2
Published Date: 12/05/2009
Worksafe Procedure
$7.5

Related products

NR NR/L2/SIG/30097/APPN ISSUE 2
Published Date: 06/02/2012
Modular Signalling: Appendix N: Non-signalling Designs
$7.5
NR RT/E/WI/27058 ISSUE 1
Published Date: 12/04/2004
Method of Applying Zone Reach & Timer Settings to DZA & AKE Protection Relays Using BR DZ Test Set (aka NR/WI/ELP/27058)
$18.6
NR X70021 ISSUE 2
Published Date: 12/05/2009
MCB Typical Circuits (CCTV ONLY) Control Circuits
$5.7
NR BRS-ST 97/10 ISSUE C
Published Date: 02/01/1973
Label (Auto) MK II B Terminations (1 - 8) Flashing Lights
$5.7

Best-Selling Products