Name:
NR NR/L2/OHS/00130/01 ISSUE 1 PDF
Published Date:
03/05/2022
Status:
[ Revised ]
Publisher:
Network Rail
This module defines the processes and hierarchy of controls for use when establishing a site of works segregated from the operational railway on a platform within a station environment.
Purpose
This module provides risk-based controls to works on a platform within a station environment so it can be segregated from the railway.
The module:
a) eliminates, or reduces to as low as reasonably practical, risk to the operational railway;
b) allows for efficiencies, as once the site of work designated as segregated from the railway is set up, NR/L2/OHS/019 does not have to be applied and non-PTS operatives can be utilised.
NOTE: All other relevant Network Rail standards are applicable to works using this standard.
| Edition : | 1 |
| File Size : | 1 file , 740 KB |
| Number of Pages : | 12 |
| Published : | 03/05/2022 |