NR NR/L2/OHS/00130/01 ISSUE 3 PDF

NR NR/L2/OHS/00130/01 ISSUE 3 PDF

Name:
NR NR/L2/OHS/00130/01 ISSUE 3 PDF

Published Date:
09/07/2024

Status:
[ Active ]

Description:

Creating a Site of Work Segregated from the Railway: On a Platform Within a Station Environment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module defines the processes and hierarchy of controls for use when establishing a site of works segregated from the operational railway on a platform within a station environment. 

If more than 1.25m from the platform edge, and a risk assessment supports this, activities such as taking photographs and visual surveys, such as a reasonable passenger might do, can be carried out without segregation under NR/L2/OHS/00130. 

Activities such as these are not allowed to impede the operation of the platform or operational equipment.

Purpose 

This module provides risk-based controls to works on a platform within a station environment so it can be segregated from the railway. 

The module eliminates, or reduces to as low as reasonably practicable, risk to the operational railway. Once the site of work designated as segregated from the railway is set up, NR/L2/OHS/019 does not have to be applied and non-PTS operatives can be utilised. 

All other relevant Network Rail standards are applicable to works using this module.


Edition : 3
File Size : 1 file , 570 KB
Number of Pages : 12
Published : 09/07/2024

History

NR NR/L2/OHS/00130/01 ISSUE 3
Published Date: 09/07/2024
Creating a Site of Work Segregated from the Railway: On a Platform Within a Station Environment
$13.2
NR NR/L2/OHS/00130/01 ISSUE 2
Published Date: 06/03/2023
Creating a Site of Work Segregated from the Railway: On a Platform Within a Station Environment - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2
NR NR/L2/OHS/00130/01 ISSUE 1
Published Date: 03/05/2022
Creating a Site of Work Segregated from the Railway: On a Platform Within a Station Environment
$13.2

Related products

NR NR/CIV/SD/4551 ISSUE 2
Published Date: 03/05/2021
Frame Open Footbridge Series 4500: Bridge Level GA
$5.4
NR NR/L3/INV/3001/901 ISSUE 2
Published Date: 09/04/2021
Reporting and Investigation Manual: Management of Recommendations and Local Actions
$13.2
NR BRS-SM 2237 ISSUE B
Published Date: 09/12/1990
Rail Clamp Point Lock MK 2 Switch Rail Bracket Assembly Type SD3-C6 for Crossing Flatter than 1 in 17 FB Track
$5.7
NR RT/E/S/10110 ISSUE 1
Published Date: 08/01/1999
Requirement Specification for Performance of Position Light Signals (aka NR/SP/SIG/10110)
$18.6

Best-Selling Products

ICPA SS-1-2001
Published Date: 01/01/2001
Performance Standard for Solid Surface Materials
$12