Name:
NR NR/L2/OHS/00130/03 ISSUE 2 PDF
Published Date:
06/03/2023
Status:
[ Active ]
Publisher:
Network Rail
This module applies to a site of work designated as being segregated from the railway within a possession and it covers two scenarios:
Scenario 1: construction of a new railway line (or other engineering works that will connect with the operational railway)
Scenario 2: construction works taking place within a possession and or siding possession where temporary segregation from open lines can be established.
Purpose
This module provides risk-based controls for works being undertaken within a possession, where temporary segregation from open lines can be established so that:
a) risk to the operational railway is eliminated or reduced to so far as is reasonably practicable;
b) once the site of work designated as segregated from the railway is in place, the requirements of NR/L2/OHS/019 do not apply and non-PTS operatives can be used.
NOTE: All other relevant Network Rail standards apply.
| Edition : | 2 |
| File Size : | 1 file , 370 KB |
| Number of Pages : | 12 |
| Published : | 06/03/2023 |