NR NR/L2/OHS/00130 ISSUE 3 PDF

NR NR/L2/OHS/00130 ISSUE 3 PDF

Name:
NR NR/L2/OHS/00130 ISSUE 3 PDF

Published Date:
09/07/2024

Status:
[ Active ]

Description:

Creating a Site of Work Segregated from the Railway

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This manual specifies the requirements for the segregation of site-based work activities, including plant and vehicular deliveries, on Network Rail Managed Infrastructure (NRMI) from railway operations.

It covers:

a) personnel safety;

b) the arrangements for the working of mechanical equipment;

c) general construction plant;

d) the movement and storage of materials; and

e) any other activities involved with the work.

The manual applies to:

a) site-based maintenance, construction and survey work which can be segregated from railway operations.

b) all works where Network Rail is the promoter.

This is not intended for maintenance taking place in cyclical possessions.

NOTE: This segregation is done in such a way as to eliminate, or reduce so far as is reasonably practicable, the transfer of safety risk from the site of work to the operational railway and vice-versa.

It can also be used by agreement (between relevant parties) by train operators, 3rd parties and outside parties, (for example by third party owners of depots and freight yards).

The manual is formed of the modules in Table 1.

This standard applies to works situated on the Network Rail Managed Infrastructure. It does not cover works that are off the NRMI and do not affect the NRMI.

Purpose

This manual allows site-based work to take place without the necessity to apply the specific control measures associated with the operational railway as defined within NR/L2/OHS/019, but in doing so requires other controls and a controlled environment.

It improves safety by defining safe methods of work that, once in place, will eliminate, or reduce risk so far as is reasonably practical, to or from the operational railway.

Efficiencies can be derived once the site of work designated as being segregated from the railway has been set up by not having to apply NR/L2/OHS/019 and from being able to utilise non-Personal Track Safety, (PTS) staff and contractors.

All other relevant Network Rail standards apply to works using this standard unless it is being used in conjunction with NR/L3/OHS/005.

NOTE: Network Rail strives to maximise train paths to meet customer and stakeholder demands. This is in parallel with an increase in the amount of work being delivered by Network Rail. Effectively managing the risks posed by construction plant and machinery working alongside lines open to traffic is one of Network Rail’s highest priorities.


Edition : 3
File Size : 3 files , 1.8 MB
Number of Pages : 19
Published : 09/07/2024

History

NR NR/L2/OHS/00130 ISSUE 3
Published Date: 09/07/2024
Creating a Site of Work Segregated from the Railway
$13.2
NR NR/L2/OHS/00130 ISSUE 2
Published Date: 06/03/2023
Creating a Site of Work Segregated from the Railway - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2
NR NR/L2/OHS/00130 ISSUE 1
Published Date: 03/05/2022
Creating a Site of Work Segregated from the Railway
$13.2

Related products

NR TI 144 ISSUE 1
Published Date: 07/01/2009
Management and Maintenance of Un-worked Points in Running Lines
$5.7
NR NR/L3/NSC/313/SP-2.03 ISSUE 1
Published Date: 12/05/2015
On-Track Machines (OTMs) Driver and Operations Standards Manual: Adhesion Preparation
$7.5
NR BRS-SW 67-11 ISSUE 6
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Push Buttons in Two PBI Rings Ring Split at Signal Post
$5.7
NR NR/GN/ELP/27600 ISSUE 2
Published Date: 03/04/2017
Index of Standard Electrical Power Forms
$7.5

Best-Selling Products

AICHE B-2
Published Date: 01/01/1986
DIERS: Technology Summary Emergency Relief Systems for Runaway Chemical Reactions and Storage Vessels: A Summary of Multiphase Flow Methods
$19.5
AICHE B-3
Published Date: 01/01/1986
DIERS: Small/Large Scale Experimental Data and Analysis
$37.5
AICHE B-4
Published Date: 01/01/1986
DIERS: Bench-Scale Apparatus Design and Test Results Large Scale Polystyrene-Ethylbenzene High Viscosity Two-Phase Flow Test Report
$15
AICHE C-19
Published Date: 01/01/2001
CCPS: Making EHS an Integral Part of Process Design
$20.4
AICHE E-24
Published Date: 01/01/1987
TRAY DISTILLATION COLUMNS A Guide to Performance Evaluation
$7.5
AICHE E-29
Published Date: 04/29/1993
PARTICLE SIZE CLASSIFIERS
$19.5