Name:
NR NR/L2/OHS/501/W2 ISSUE 1 PDF
Published Date:
12/05/2020
Status:
[ Revised ]
Publisher:
Network Rail
This module applies to all ATWS systems used on Network Rail Managed Infrastructure.
NOTE: ATWS is not interfaced with the signalling system. The equipment is owned and managed by the local manager of the function using it e.g. Infrastructure Maintenance Delivery Manager, HOBC project manager etc...
Purpose
This module mandates the requirements for the use of Automatic Track Warning Systems (ATWS) on Network Rail Managed Infrastructure
In addition, it provides details of:
• Technical requirements
• Competence requirements
• Planning, installation, use, and removal.
| Edition : | 1 |
| File Size : | 1 file , 360 KB |
| Number of Pages : | 25 |
| Published : | 12/05/2020 |