NR NR/L2/OPS/251/1.1 ISSUE 1 PDF

NR NR/L2/OPS/251/1.1 ISSUE 1 PDF

Name:
NR NR/L2/OPS/251/1.1 ISSUE 1 PDF

Published Date:
12/03/2016

Status:
[ Inactive ]

Description:

Air Operations Manual: Unmanned Aircraft System (Drone / UAV) Operations - Managing the Operational Risks

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
INACTIVE * PDF ONLY

This process outlines requirements on the management of risks associated with the operation of drones or UAVs near, on or over Network Rail infrastructure and mandates:

a) minimum requirements of operating organisations;

b) minimum competency requirements for unmanned aircraft operators;

c) minimum equipment requirements;

d) proximity to Network Rail Infrastructure;

e) notification arrangements;

f) accident reporting.

This process applies to any individual or organisation wishing to operate drones or UAVs near, on or over Network Rail infrastructure.

PURPOSE

This process has been introduced to describe the operating arrangements and to mitigate risk of uncontrolled operation of Unmanned Aerial Vehicles (UAVs / Drones) being operated near, on or over Network Rail infrastructure.

This standard is in alignment with the following:

Air Navigation Order (ANO) (Articles relating to unmanned aircraft operations)

Civil Aviation Authority (CAA) Guidance Publication CAP 722

European Aviation Safety Authority (EASA) or other regulatory requirements as appropriate


Edition : 1
File Size : 1 file , 380 KB
Number of Pages : 10
Published : 12/03/2016

History


Related products

NR NR/PRC/MPI/PP03.2 ISSUE 1
Published Date: 10/30/2006
Manage the Plan
$18.6
NR NR/L2/CTM/012/032 ISSUE 1
Published Date: 03/06/2010
Sig 32: Install and adjust mechanical point operating systems
$5.7
NR TI 162 ISSUE 1
Published Date: 07/15/2011
Restriction of Positioning of TPWS Loop in Reference to EBI Track 200
$5.7
NR NR/FP C181 ISSUE 4
Published Date: 09/03/2011
Plant & Equipment Work Instructions: Periodic Inspection & Testing of Fixed 'Low Voltage' Electrical Installations
$5.7

Best-Selling Products