Name:
NR NR/L2/OTK/5100/MOD01 ISSUE 4 PDF
Published Date:
03/06/2021
Status:
[ Revised ]
Publisher:
Network Rail
This module applies to inspection and risk assessment of boundary measures and all who are involved in those activities. This module covers:
a) identifying the appropriate frequency of inspections;
b) recording and scheduling inspection activity within the asset register;
c) assigning the persons responsible for undertaking the inspection;
d) the requirements when undertaking inspections; and
e) approval and record keeping following the inspection.
This module does not cover:
f) inspections of security measures that do not form part of the boundary;
g) inspections of retaining walls (see NR/L3/CIV/006);
h) inspections for vehicle containment (see NR/L3/CIV/00012);
i) Inspections of acoustic fences (barriers);
j) inspections of touch potential barriers;
k) inspections of boundary measures forming part of a station or depot lease agreement.
A flow chart of the process within this module can be found in Appendix A
| Edition : | 4 |
| File Size : | 1 file , 550 KB |
| Number of Pages : | 24 |
| Published : | 03/06/2021 |