NR NR/L2/OTK/5201 ISSUE 5 PDF

NR NR/L2/OTK/5201 ISSUE 5 PDF

Name:
NR NR/L2/OTK/5201 ISSUE 5 PDF

Published Date:
12/05/2020

Status:
[ Active ]

Description:

Lineside Vegetation Management Manual

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This manual contains:

a) key principles for the management of risk;

b) asset knowledge; and

c) the impact of vegetation on other assets.

The manual applies to inspecting, managing and maintaining lineside vegetation and all who are involved in those activities.

Out of scope for this process are:

a) management of vegetation necessary only for the stability and security of e arthworks and structures;

b) management and inspection of vegetation in advance or in response to adverse/severe weather events which is included within NR/L2/OPS/021 ‘Weather – managing the operational risks’; and

d) environmental and community requirements for vegetation management.

Purpose

Lineside vegetation management is a process that uses risk assessment to contribute to the sustainable management of the lineside estate and the safe running of the railway infrastructure.

Risk from lineside vegetation is controlled by inspection, management and maintenance. These activities protect the Network Rail workforce and third parties against harm.

Responsible management of vegetation and respecting our neighbours improves the resilience of lineside environments and stakeholder relations.

Lineside vegetation includes areas on the operational railway, closed lines, nonoperational or third party land.

Management of lineside vegetation is a control from the threats identified on bow tie ‘railway or third party vegetation affecting safety’ and co ntrols or mitigates the following risks:

a) trees within falling distance of the track or third party land;

b) vegetation affecting:

1. overhead line equipment;

2. signal sighting;

3. level crossing sighting;

4. position of safety/refuge;

5. railway vehicles by damage to rolling stock;

6. railway access;

7. inspection of assets;

8. renewal of other assets; and

9. enhancement projects;

c) leaf fall affecting the railway;

d) injurious and invasive weeds; and

e) damage to railway infrastructure or third parties.

Planned maintenance helps to deliver the most effective management regime once a compliant profile has been achieved.


Edition : 5
File Size : 1 file , 840 KB
Number of Pages : 21
Published : 12/05/2020

History

NR NR/L2/OTK/5201 ISSUE 5
Published Date: 12/05/2020
Lineside Vegetation Management Manual
$18.6
NR NR/L2/OTK/5201 ISSUE 4
Published Date: 03/07/2020
Lineside Vegetation Management Manual
$13.2

Related products

NR NR/L3/ELP/27240/NR/DIST C25T ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of 750v d.c. Disconnect Switches
$5.7
NR BRS-SM 440/09 ISSUE A
Published Date: 09/22/1995
Standard Apparatus Case G.A. of Small Case Framework Typical Example of Battery Charger
$5.7
NR NR/L2/SIG/30014/G130/EL52 ISSUE 1
Published Date: 09/03/2011
Install a Varistor Surge Protector
$5.7
NR NR/PRC/MTC/ME0007 ISSUE 1
Published Date: 04/01/2007
On Site Management of on Track Plant
$18.6

Best-Selling Products