NR NR/L2/OTK/5201 ISSUE 4 PDF

NR NR/L2/OTK/5201 ISSUE 4 PDF

Name:
NR NR/L2/OTK/5201 ISSUE 4 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Lineside Vegetation Management Manual

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This manual contains:

 a) key principles for the management of risk;

 b) asset knowledge; and

 c) the impact of vegetation on other assets.

The document applies to inspecting, managing and maintaining lineside vegetation and all who are involved in those activities.

Out of scope for this process are:

 a) management of vegetation necessary only for the stability and security of earthworks and structures;

 b) management and inspection of vegetation in advance or in response to adverse/severe weather events which is included within NR/L2/OPS/021 ‘Weather – managing the operational risks’; and

 d) environmental and community requirements for vegetation management.

Purpose

Lineside vegetation management is a process that uses risk assessment to contribute to the sustainable management of the lineside estate and the safe running of the railway infrastructure.

Risk from lineside vegetation is controlled by inspection, management and maintenance. These activities protect the Network Rail workforce and third parties against harm.

Responsible management of vegetation and respecting our neighbours improves the resilience of lineside environments and stakeholder relations

Lineside vegetation includes areas on the operational railway, closed lines, non operational or third party land

Management of lineside vegetation is a control from the threats identified on bow tie ‘railway or third party vegetation affecting safety’ and controls or mitigates the

following risks:

a) trees within falling distance of the track or third party land;

b) vegetation affecting:

 1. overhead line equipment;  

 2. signal sighting;  

 3. level crossing sighting;  

 4. position of safety/refuge;  

 5. railway vehicles by damage to rolling stock;  

 6. railway access;  

 7. inspection of assets;  

 8. renewal of other assets; and  

 9. enhancement projects;

c) leaf fall affecting the railway;

d) injurious and invasive weeds; and

e) damage to railway infrastructure or third parties.

Planned maintenance helps to deliver the most effective management regime once a compliant profile has been achieved.


Edition : 4
File Size : 1 file , 810 KB
Number of Pages : 20
Published : 03/07/2020

History

NR NR/L2/OTK/5201 ISSUE 5
Published Date: 12/05/2020
Lineside Vegetation Management Manual
$18.6
NR NR/L2/OTK/5201 ISSUE 4
Published Date: 03/07/2020
Lineside Vegetation Management Manual
$13.2

Related products

NR X72210 ISSUE 2
Published Date: 03/03/2012
MCB Typical Circuits (CCTV) Only CCTV Receiver Cubicle Monitor and Video Recorder Circuits
$5.7
NR E10000/161/5 ISSUE A
Published Date: 11/01/1993
WR Control Table - A.W.S Inductors / Suppressors
$5.7
NR SSI8508 ISSUE 4
Published Date: 12/01/2009
SSI Applications Manual - SSI Technician's Terminal Logger Recorder (TTLR) User Guide
$18.6
NR BRS-SM 47 ISSUE A
Published Date: 12/06/1974
Offset Plate for Wire Cranks
$5.7

Best-Selling Products

ARINC 404A
Published Date: 03/15/1974
Air Transport Equipment Cases and Racking
$105
ARINC 404B-1
Published Date: 12/06/2002
Connectors, Rack and Panel, Rectangular Rear Release Crimp Contacts
$75.6
ARINC 404B-2
Published Date: 06/30/2015
CONNECTORS, RACK AND PANEL, RECTANGULAR REAR RELEASE CRIMP CONTACTS
$90.3
ARINC 404B
Published Date: 03/30/1998
CONNECTORS, RACK AND PANEL, RECTANGULAR REAR RELEASE CRIMP CONTACTS
$23.7
ARINC 406A
Published Date: 07/31/1972
OBSOLETE - FOR REFERENCE ONLY Airborne Electronic Equipment Standardized Interconnections and Index Pin Codes
$33.9
ARINC 407-1
Published Date: 09/15/1958
ARINC Synchro System Manual Reports No. 407 & 407-1 Combined Issue
$90.3