NR NR/L2/P3M/220 ISSUE 1 PDF

NR NR/L2/P3M/220 ISSUE 1 PDF

Name:
NR NR/L2/P3M/220 ISSUE 1 PDF

Published Date:
06/05/2021

Status:
[ Revised ]

Description:

Project Acceleration in a Controlled Environment (PACE) - Manage Integration

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard specifies the activities required to identify, define, and coordinate the processes and key management activities throughout a project’s lifecycle.

This standard is part of the Capital Delivery Core Process and relates to NR/L2/P3M/201.

It applies to projects that require Investment Authority as defined within IR01 Investment Regulations and enhance or renew the operational railway.

Purpose

The Project, Programme and Portfolio management (P3M) framework policy and Project Acceleration in a Controlled Environment (PACE) describe how Network Rail manages and controls investment projects on the rail network.

Network Rail has developed this approach to managing projects in order to minimise and mitigate the risks associated with project development and delivery. PACE provides a more flexible control framework enabling sponsors and project managers to tailor the controls therein to better meet the requirements of their project. The PACE framework is shown in figure 1.

The approach is based on best practice within comparable industries that undertake major investment projects.

Application of this standard during investment projects on the rail network can reduce the reputational and financial risk related to the delivery of projects.

This standard supports the effective coordination and management of interfaces and inputs for delivering successful outcomes across the seven PACE processes.

This standard brings together the seven core PACE processes undertaken during project development and delivery:

a) manage integration;

b) manage scope;

c) manage time for projects;

d) manage cost and commercial;

e) manage risk for projects;

f) manage assurance; and

g) manage stakeholders.


Edition : 1
File Size : 1 file , 520 KB
Number of Pages : 17
Published : 06/05/2021

History

NR NR/L2/P3M/220 ISSUE 2
Published Date: 12/03/2022
Project Acceleration in a Controlled Environment (PACE) - Manage Integration
$18.6
NR NR/L2/P3M/220 ISSUE 1
Published Date: 06/05/2021
Project Acceleration in a Controlled Environment (PACE) - Manage Integration
$13.2

Related products

NR NR/L2/ELP/27213 ISSUE 3
Published Date: 08/26/2008
Maintenance of Mark 3A Overhead Line Equipment
$18.6
NR NR/L3/OCS/044/FS-05C ISSUE 1
Published Date: 06/04/2011
Managed Station Manual: Station Crime Toolkit
$5.7
NR NR/L3/ELP/27052/02 ISSUE 3
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line: General Instructions for Working On or Near Conductor Rail Equipment
$13.2
NR NR/L3/CIV/005/2D ISSUE 1
Published Date: 12/04/2010
Railway Drainage Systems Manual Part 2D: Remediation
$7.5

Best-Selling Products

NATO AACP-02.1
Published Date: 07/09/2019
COUNTRY POINTS OF CONTACT
NATO AACP-02
Published Date: 07/09/2019
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS
NATO AACP-1
Published Date: 01/01/1989
GUIDANCE FOR THE DRAFTING OF MOUS AND PROGRAMME MOUS - BASIC CONSIDERATIONS CHECKLIST
NATO AACP-2 VOL 10
Published Date: 02/14/2012
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS - VOLUME 10
NATO AACP-2 VOL 1
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR FEASIBILITY STUDY WORK - VOLUME 1
NATO AACP-2 VOL 2
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR PROJECT DEFINITION AND DESIGN AND DEVELOPMENT - VOLUME 2