NR NR/L2/P3M/220 ISSUE 2 PDF

NR NR/L2/P3M/220 ISSUE 2 PDF

Name:
NR NR/L2/P3M/220 ISSUE 2 PDF

Published Date:
12/03/2022

Status:
[ Active ]

Description:

Project Acceleration in a Controlled Environment (PACE) - Manage Integration

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This standard specifies the activities required to identify, define, and coordinate the processes and key management activities throughout a project’s lifecycle.

This standard is part of the Capital Delivery Core Process and relates to NR/L2/P3M/201. 

It applies to projects that require Investment Authority as defined within IR01 Investment Regulations and enhance or renew the operational railway.

Throughout this document ‘project’ is used interchangeably with ‘programmes’ and ‘portfolios’, unless otherwise stated.

Purpose 

The Capital Investment and Delivery Policy and Project Acceleration in a Controlled Environment (PACE) describe how Network Rail manages and controls investment projects on the rail network. 

Network Rail has developed this approach to managing projects in order to minimise and mitigate the risks associated with project development and delivery. PACE provides a more flexible control framework, enabling sponsors, project managers and designated project engineers (DPEs) to tailor the controls therein to better meet the requirements of their project. The PACE framework is shown in figure 1.

The approach is based on best practice within comparable industries that undertake major investment projects. 

Application of this standard during investment projects on the rail network can reduce the reputational and financial risk related to the delivery of projects. 

This standard supports the effective coordination and management of interfaces and inputs for delivering successful outcomes across the PACE processes. 

This standard brings together the core PACE processes undertaken during project development and delivery: 

a) manage integration; 

b) manage scope; 

c) manage time for projects; 

d) manage risk; 

e) manage assurance; and 

f) manage stakeholders. 


Edition : 2
File Size : 1 file , 520 KB
Number of Pages : 24
Published : 12/03/2022

History

NR NR/L2/P3M/220 ISSUE 2
Published Date: 12/03/2022
Project Acceleration in a Controlled Environment (PACE) - Manage Integration
$18.6
NR NR/L2/P3M/220 ISSUE 1
Published Date: 06/05/2021
Project Acceleration in a Controlled Environment (PACE) - Manage Integration
$13.2

Related products

NR NR/CIV/SD/532 ISSUE B
Published Date: 09/02/2017
Tunnel Lining Maintenance Repairs: Stone Masonry Refurbishment
$5.7
NR NR/L3/OCS/043/7.3 ISSUE 3
Published Date: 12/01/2012
National Control Instructions: Fatalities
$5.7
NR BRS-ST 88/4 ISSUE A
Published Date: 11/01/1967
Vertical Support Frame Assembly Lifting Barrier (Auto) MK II B
$5.7
NR NR/L3/OCS/044/FS-07S ISSUE 1
Published Date: 06/04/2011
Managed Station Manual: Use of Access Equipment on Managed Stations
$13.2

Best-Selling Products

AS (RISSB) 1085.1:2019
Published Date: 09/25/2019
Railway Track Material, Part 1: Steel Rails
$49.5
AS (RISSB) 1085.14:2019
Published Date: 12/02/2019
Railway track material, Part 14: Prestressed concrete sleepers
$49.5
AS (RISSB) 1085.17:2021
Published Date: 06/22/2021
Railway track material, Part 17: Steel sleepers
$50.49
AS (RISSB) 1085.20:2020
Published Date: 06/23/2020
Railway track materials, Part 20: Welding of steel rail
$12.078
AS (RISSB) 1085.21:2020
Published Date: 06/23/2020
Railway track material, Part 21: Turnouts, switches and crossings
$26.532
AS (RISSB) 1085.22:2020
Published Date: 03/24/2020
Railway track materials: Alternative material sleepers
$49.5