NR NR/L2/P3M/221 ISSUE 1 PDF

NR NR/L2/P3M/221 ISSUE 1 PDF

Name:
NR NR/L2/P3M/221 ISSUE 1 PDF

Published Date:
06/05/2021

Status:
[ Revised ]

Description:

Project Acceleration in a Controlled Environment (PACE) - Manage Scope

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard specifies:

a) the scope management activities throughout the PACE lifecycle;

b) deliverables;

c) milestones; and

d) roles and responsibilities.

This standard is part of the Capital Delivery Core Process and relates to NR/L2/P3M/201.

It applies to projects that require Investment Authority as defined within IR01 Investment Regulations and enhance or renew the operational railway.

Purpose

The project, programme and portfolio management (P3M) framework policy and Project Acceleration in a Controlled Environment (PACE) describe how Network Rail manages and controls investment projects on the rail network.

Network Rail has developed this approach to managing projects in order to minimise and mitigate the risks associated with project development and delivery. PACE provides a more flexible control framework enabling sponsors and project managers to tailor the controls herein to better meet the requirements of their project. The PACE framework is shown in figure 1.

The approach is based on best practice within comparable industries that undertake major investment projects.

This embeds a consistent scope management practice throughout Network Rail.

This standard enables the business to manage and reduce the risks associated with:

a) developing, designing and delivering solutions based on incomplete, unverifiable, erroneous or missing scope;

b) the inability to demonstrate /assure project requirement sets for completeness, and

c) the inability to demonstrate the benefits enablement or realisation.

The process that support scope management throughout the PACE lifecycle are shown in figure 2.

The receipt of an Initial Instruction is documented in NR/L2/P3M/220.


Edition : 1
File Size : 1 file , 650 KB
Number of Pages : 18
Published : 06/05/2021

History

NR NR/L2/P3M/221 ISSUE 2
Published Date: 12/03/2022
Project Acceleration in a Controlled Environment (PACE) - Manage Scope
$13.2
NR NR/L2/P3M/221 ISSUE 1
Published Date: 06/05/2021
Project Acceleration in a Controlled Environment (PACE) - Manage Scope
$13.2

Related products

NR NR/L3/OPS/045/2.24 ISSUE 1
Published Date: 03/04/2023
National Operating Procedures Index: Mobile Operations Manager and Mobile Incident Officers Training and Competence Arrangements
$18.6
NR NR/FP C021A ISSUE 5
Published Date: 09/04/2021
Fixed Plant Work Instructions: 'Bender' IRDH265 (RS2) Readings and Test Instructions
$5.7
NR T28265 ISSUE 2
Published Date: 06/20/2009
Lineside & on Track Equipment Typical Circuits Signals & Indicators Aspect Sequence with Banner Repeater, Single
$5.7
NR RT/E/C/19039 ISSUE 1
Published Date: 02/01/2001
Signalling Equipment Technical Advice Notice (SIGTAN039) - Signals (General) (aka NR/GN/SIG/19039)
$18.6

Best-Selling Products

BRE AP100
Published Date: 01/01/1995
Pfa concrete; Set of four reports (BR294 to BR297)
$19.5
BRE AP135
Published Date: 01/01/2000
Value management
$15.9
BRE AP138
Published Date: 01/01/2000
BR358 Quiet homes & BR406 Specifying dwellings with enhanced sound insulation
$17.1
BRE AP139
Published Date: 01/01/2000
Domestic energy fact file; Set of four reports
$41.4
BRE AP146
Published Date: 01/01/2002
Managing sustainable construction; Profiting from sustainability
$9.3
BRE AP147
Published Date: 01/01/2002
Thaumasite in cementitous materials; Proceedings of the first international conference BRE 19-21 June 2002
$87.3