NR NR/L2/P3M/221 ISSUE 2 PDF

NR NR/L2/P3M/221 ISSUE 2 PDF

Name:
NR NR/L2/P3M/221 ISSUE 2 PDF

Published Date:
12/03/2022

Status:
[ Active ]

Description:

Project Acceleration in a Controlled Environment (PACE) - Manage Scope

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard specifies:

a) the scope management activities throughout the PACE lifecycle;

b) deliverables; and

c) roles and responsibilities.

This standard is part of the Capital Delivery Core Process and relates to NR/L2/P3M/201.

It applies to projects that require Investment Authority as defined within IR01 Investment Regulations and enhance or renew the operational railway.

Throughout this document ‘project’ is used interchangeably with ‘programmes’ and ‘portfolios’, unless otherwise stated.

The processes that support scope management throughout the PACE lifecycle are shown in figure 2.

The receipt of an Initial Instruction is documented in NR/L2/P3M/220.

Purpose

The Capital Investment and Delivery Policy and Project Acceleration in a Controlled Environment (PACE) describe how Network Rail manages and controls investment projects on the rail network.

Network Rail has developed this approach to managing projects in order to minimise and mitigate the risks associated with project development and delivery. PACE provides a more flexible control framework enabling sponsors and project managers to tailor the controls therein to better meet the requirements of their project. The PACE framework is shown in figure 1.

The approach is based on best practice within comparable industries that undertake major investment projects.

This embeds a consistent scope management practice throughout Network Rail. It enables identification of and reaching agreement on the Minimum Viable Product (MVP). This standard enables the business to manage and reduce the risks associated with:

a) developing, designing and delivering solutions based on incomplete, unverifiable, erroneous or missing scope;

b) the inability to demonstrate / assure project requirement sets for completeness against the agreed scope; and

c) the inability to demonstrate the benefits enablement or realisation. 


Edition : 2
File Size : 1 file , 14 MB
Number of Pages : 18
Published : 12/03/2022

History

NR NR/L2/P3M/221 ISSUE 2
Published Date: 12/03/2022
Project Acceleration in a Controlled Environment (PACE) - Manage Scope
$13.2
NR NR/L2/P3M/221 ISSUE 1
Published Date: 06/05/2021
Project Acceleration in a Controlled Environment (PACE) - Manage Scope
$13.2

Related products

NR NR/CIV/SD/1431 ISSUE D
Published Date: 12/03/2016
D-Type Underbridges: Cross Girder & Trimmer: Square Filler Beam Floor Cross Girder
$5.7
NR SSI8003-10D ISSUE 4
Published Date: 09/03/2022
SSI Interlocking - Data Files Source Language
$18.6
NR BRS-SM 458
Published Date:
4" Centres Ground Frame Spacing Collar
$5.7
NR NR/L2/CIV/005/11 ISSUE 1
Published Date: 06/02/2018
Drainage Systems Manual: Drainage Maintenance
$13.2

Best-Selling Products