NR NR/L2/P3M/222 ISSUE 2 PDF

NR NR/L2/P3M/222 ISSUE 2 PDF

Name:
NR NR/L2/P3M/222 ISSUE 2 PDF

Published Date:
12/03/2022

Status:
[ Active ]

Description:

Project Acceleration in a Controlled Environment (PACE) - Manage Time

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard specifies the principles to be adopted for, and the roles and responsibilities associated with planning and scheduling projects.

This standard is part of the Capital Delivery Core Process and relates to NR/L2/P3M/201 and NR/L2/P3M/220.

It applies to projects that require Investment Authority as defined within IR01 Investment Regulations and enhance or renew the operational railway.

Throughout this document ‘project’ is used interchangeably with ‘programmes’ and ‘portfolios’, unless otherwise stated.

Purpose 

The Capital Investment and Delivery Policy and Project Acceleration in a Controlled Environment (PACE) describe how Network Rail manages and controls investment projects on the rail network.

Network Rail has developed this approach to managing projects in order to minimise and mitigate the risks associated with project development and delivery. PACE provides a more flexible control framework, enabling sponsors and project managers to tailor the controls therein, to better meet the requirements of their project. The PACE framework is shown in figure 1. 

This standard reduces the risk of project delays and ineffective resourcing. It supports project teams and stakeholders to monitor progress, manage expectations and communicate and collaborate clearly, in order to optimise time and resources effectively. 

The approach is based on best practice within comparable industries that undertake major investment projects. 

This standard sets out the requirements for project time management. This includes the processes required to manage the timely completion of the project.

Project time management processes and their associated tools and techniques are documented in the schedule management plan. 

Project schedule development defines activities, sequences activities, estimates activity resources, and estimates activity duration combination with the scheduling tool to produce the schedule model. 

The project schedule satisfies the business need for a forward plan or timetable and measurement tool. This standard aims to deliver a consistent approach to scheduling for Network Rail.


Edition : 2
File Size : 1 file , 450 KB
Number of Pages : 20
Published : 12/03/2022

History

NR NR/L2/P3M/222 ISSUE 2
Published Date: 12/03/2022
Project Acceleration in a Controlled Environment (PACE) - Manage Time
$13.2
NR NR/L2/P3M/222 ISSUE 1
Published Date: 06/05/2021
Project Acceleration in a Controlled Environment (PACE) - Manage Time
$13.2

Related products

NR NR/L2/P3M/221 ISSUE 2
Published Date: 12/03/2022
Project Acceleration in a Controlled Environment (PACE) - Manage Scope
$13.2
NR BRS-SM 60/3
Published Date: 06/07/1974
Colour Light Signals Rear Guard Rail Central Hoop for Wide Top Staging
$5.7
NR NR/L3/TRK/055/U17 ISSUE 2
Published Date: 12/03/2022
Work Instructions for Ultrasonic Rail Testing: Ultrasonic Testing of the Rail Foot for Transverse Cracks Under the Web Using a Roller Search Unit
$7.5
NR BRS-SM 3010 ISSUE 1
Published Date: 02/07/2007
Hy-Drive Point Layout NR60 Plain Lead Toe End Detail
$5.7

Best-Selling Products

ASCE 1-82
Published Date: 01/01/1983
N-725 Guideline for Design and Analysis of Nuclear Safety Related Earth Structures
$9.9
ASCE 10-97
Published Date: 01/01/2000
Design of Latticed Steel Transmission Structures
$14.4
ASCE 11-99
Published Date: 01/01/2000
Guideline for Structural Condition Assessment of Existing Buildings, SEI/ASCE 11-99
$23.7
ASCE 12-05/13-05/14-05
Published Date: 01/01/2006
Standard Guidelines for the Design of Urban Subsurface Drainage (ASCE/EWRI 12-05); Standard Guidelines for the Installation of Urban Subsurface Drainage (ASCE/EWRI 13-05); and Standard Guidelines for the Operation and Maintenance of Urban Subsurface Drainage (ASCE/EWRI 14-05)
$21.6