NR NR/L2/P3M/224 ISSUE 2 PDF

NR NR/L2/P3M/224 ISSUE 2 PDF

Name:
NR NR/L2/P3M/224 ISSUE 2 PDF

Published Date:
12/03/2022

Status:
[ Revised ]

Description:

Project Acceleration in a Controlled Environment (PACE) - Manage Risk

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This standard specifies the process for, and roles and responsibilities associated with, the management of project risks. It sets out the specific requirements for capital project risk in support of NR/L1/RSK/001.

This standard is part of the Capital Investment and Delivery Core Process and relates to NR/L2/P3M/201.

It applies to projects that require Investment Authority as defined within IR01 Investment Regulations and enhance or renew the operational railway.

Throughout this document ‘project’ is used interchangeably with ‘programmes’ and ‘portfolios’, unless otherwise stated.

Purpose

The Capital Investment and Delivery Policy and Project Acceleration in a Controlled Environment (PACE) describe how Network Rail manages and controls investment projects on the rail network.

Network Rail has developed this approach to managing projects in order to minimise and mitigate the risks associated with project development and delivery. PACE provides a more flexible control framework enabling sponsors project managers and designated project engineers (DPEs) to tailor the controls therein to better meet the requirements of their project. The PACE framework is shown in figure 1.

The approach is based on best practice within comparable industries that undertake major investment projects. Network Rail recognises that the effective management of risk is critical to successfully delivering project outcomes and benefits for passengers. This standard provides a flexible methodology for projects to proactively manage the risk arising from the complexities and uncertainties inherent in developing and delivering rail investment projects.

This standard sets out a principle-based approach for the management of project risks in Network Rail to enable:

a) the effective and consistent management of project risk;

b) an understanding of delivery confidence; and

c) project risks to be managed in accordance with NR/L1/RSK/001.


Edition : 2
File Size : 2 files , 660 KB
Number of Pages : 24
Published : 12/03/2022

History

NR NR/L2/P3M/224 ISSUE 3
Published Date: 06/01/2024
Project Acceleration in a Controlled Environment (PACE) - Manage Risk
$18.6
NR NR/L2/P3M/224 ISSUE 2
Published Date: 12/03/2022
Project Acceleration in a Controlled Environment (PACE) - Manage Risk
$18.6
NR NR/L2/P3M/224 ISSUE 1
Published Date: 06/05/2021
Project Acceleration in a Controlled Environment (PACE) - Manage Risk
$18.6

Related products

NR X10050 ISSUE 3
Published Date: 12/03/2011
MCB-OD Typical Circuits Layout
$5.7
NR NR/SP/ELP/27217 ISSUE 2
Published Date: 04/01/2006
Emergency Disconnection of Grid Supply Feeders for D.C. Electrification
$7.5
NR NR/CIV/SD/4302 ISSUE A
Published Date: 03/07/2020
Ribbon Open Footbridge Series 4300: Lift Shaft Details
$5.7
NR NR/L2/RSE/02009 ISSUE 8
Published Date: 03/04/2023
Engineering Management for Projects
$24.3

Best-Selling Products

IP 1/1994
Published Date: 01/01/1994
Methods of test for Petroleum and its products Part 1. Determination of acidity, neutralization value - Colour indicator titration method
$47.1
IP 1/74
Published Date: 01/01/1974
Acidity of Petroleum Products and Lubricants (Neutralization Value)
$27.6
IP 10/2011
Published Date: 07/31/2011
Methods of test for petroleum and its products Part 10: Determination of kerosine burning characteristics 24-hour method
$55.8
IP 10/65
Published Date: 01/01/1965
Determination of kerosine burning characteristics - 24 hour method
IP 10/65
Published Date: 01/01/1965
Burning test (24-hour) for kerosine
IP 10/94
Published Date: 01/01/1994
Methods of test for Petroleum and its products Part 10. Determination of kerosine burning characteristics - 24 hour method