NR NR/L2/RMVP/0200/P100 ISSUE 3 PDF

NR NR/L2/RMVP/0200/P100 ISSUE 3 PDF

Name:
NR NR/L2/RMVP/0200/P100 ISSUE 3 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Infrastructure Plant Manual: Reporting and Investigation of Plant Related Events

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module defines the:

a) type of defects occurring in plant;

b) process for reporting; and

c) actions to be taken following any occurrence that results in an accident, incident or Safety Related event when using plant.

This document applies to all organisations involved with:

a) manufacturing or supply of plant;

b) carrying out or controlling plant operations; or

c) maintaining plant used on Network Rail managed infrastructure and Network Rail projects.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) lack of RIDDOR or close call reporting; and

b) lack of continuous improvement e.g. mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 3
File Size : 1 file , 420 KB
Number of Pages : 9
Published : 12/01/2018

History

NR NR/L2/RMVP/0200/P100 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Reporting and Investigation of Plant Related Events
$7.5
NR NR/L2/RMVP/0200/P100 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Reporting and Investigation of Plant Related Events
$7.5

Related products

NR NR/CIV/SD/2118-4 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 7.4m Internal Unit Setting Out Details - Skew 45°
$5.7
NR NR/L3/OPS/045 ISSUE 28
Published Date: 07/01/2023
National Operating Procedures Index
$18.6
NR NR/L3/MTC/RCS0216/PR15 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Fixed Scaffolding/Platform
$5.7

Best-Selling Products

PDA PTC PUPSIT 1
Published Date: 02/01/2020
Points to Consider for Risks Associated with Sterilizing Grade Filters and Sterilizing Filtration
$97.5
PDA PTC PUPSIT 2
Published Date: 03/01/2020
Points to Consider for Implementation of Pre-Use Post-Sterilization Integrity Testing (PUPSIT)
$97.5
PDA TR 13-2
Published Date: 11/01/2020
Technical Report No. 13-2 Fundamentals of an Environmental Monitoring Program Annex 1: Environmental Monitoring of Facilities Manufacturing Low Bioburden Products
$97.5
PDA TR 13
Published Date: 06/01/2014
Technical Report 13 Revised, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 13
Published Date: 04/22/2022
Technical Report 13 Revised 2022, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 14
Published Date: 09/01/2008
PDA Technical Report No. 14 (TR 14) Validation of Column-Based Chromatography Processes for the Purification of Proteins
$97.5