NR NR/L2/RMVP/0200/P100 ISSUE 4 PDF

NR NR/L2/RMVP/0200/P100 ISSUE 4 PDF

Name:
NR NR/L2/RMVP/0200/P100 ISSUE 4 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Infrastructure Plant Manual: Reporting and Investigation of Plant Related Events

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module defines the:

a) type of defects occurring in rail mounted plant

b) process for reporting; and

c) actions to be taken following any occurrence that results in an accident, incident or Safety Related event when using plant.

This document applies to all organisations involved with:

a) manufacturing or supply of rail mounted plant;

b) carrying out or controlling rail mounted plant operations; or

c) maintaining rail mounted plant used on Network Rail managed infrastructure and Network Rail projects.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) lack of RIDDOR or close call reporting; and

b) lack of continuous improvement e.g. mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 4
File Size : 1 file , 240 KB
Number of Pages : 9
Published : 06/04/2022

History

NR NR/L2/RMVP/0200/P100 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Reporting and Investigation of Plant Related Events
$7.5
NR NR/L2/RMVP/0200/P100 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Reporting and Investigation of Plant Related Events
$7.5

Related products

NR NR/CIV/SD/FORMA/1500 ISSUE B
Published Date: 06/03/2009
Form A: E-Type Underbridges Deck Details
$18.6
NR BRS-SM 65/10 ISSUE E
Published Date: 12/01/1992
Colour Light Signals Adjustable Mounting Plate for Indicator Support Frame
$5.7
NR NR/L3/ELP/3091/MOD08 ISSUE 1
Published Date: 09/07/2019
DC Conductor Rail Electrified Lines Working Instructions: Restoring the Conductor Rail Equipment
$5.7
NR NR/CIV/SD/F001/16MFB ISSUE B
Published Date: 07/17/2014
Non-Station Footbridges up to 16m (100 series) - Form F001
$18.6

Best-Selling Products

PCA DX074D
Published Date:
High Strength Bars as Concrete Reinforcement, Part 6. Fatigue Tests
PCA DX093D
Published Date:
Fatigue Tests of Reinforcing Bars
PCA DX139P
Published Date:
Influence of Aggregate Properties on Effectiveness of Interlock Joints in Concrete Pavements
PCA DX145D
Published Date:
Fatigue Tests of Reinforcing Bars-Effect of Deformation Pattern
PCA EB001.15
Published Date: 2011
Design and Control of Concrete Mixtures, 15th edition
PCA EB001.16
Published Date: 2016
Design and Control of Concrete Mixtures, 16th edition