NR NR/L2/RMVP/0200/P302 ISSUE 2 PDF

NR NR/L2/RMVP/0200/P302 ISSUE 2 PDF

Name:
NR NR/L2/RMVP/0200/P302 ISSUE 2 PDF

Published Date:
06/03/2017

Status:
[ Withdrawn ]

Description:

Infrastructure Plant Manual: Approval and Review of Plant Suppliers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

This module defines the approval requirements for all suppliers of plant or plant operators. It specifies the requirements for the periodic review of suppliers. It details the action to be taken if a supplier’s operational safety management system is breached.

This module applies to all organisations involved with the procurement, manufacturing or supply of plant used on Network Rail managed infrastructure and Network Rail projects.

See the index of NR/L2/RMVP/0200 for information on which:

a) specific roles this module applies to; and

b) modules that also apply to those roles.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) incorrect lifting operations (LOLER);

b) lack of RIDDOR or close call reporting; and

c) lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 2
File Size : 1 file , 260 KB
Number of Pages : 7
Published : 06/03/2017

History


Related products

NR NR/L3/CIV/151 ISSUE 8
Published Date: 09/07/2024
Application of Standard Designs and Details for Building and Civil Engineering Works
$18.6
NR NR/L2/SIG/30009/Z115 ISSUE 1
Published Date: 12/03/2011
Train Activated Warning Systems (TAWS)
$7.5
NR TEF 3041 ISSUE 4
Published Date: 06/01/2017
Manual Measurement of Track Geometry Recording Sheet
$5.7
NR SMF/TE/0175 ISSUE 2
Published Date: 06/01/2017
Telecoms Planned Works Request
$5.7

Best-Selling Products