NR NR/L2/RMVP/0200/P503 ISSUE 4 PDF

NR NR/L2/RMVP/0200/P503 ISSUE 4 PDF

Name:
NR NR/L2/RMVP/0200/P503 ISSUE 4 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Infrastructure Plant Manual: Lifting Operations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module applies to all lifting operations carried out on Network Rail managed infrastructure and Network Rail projects when using on-track machines, on-track plant or any non-rail mounted mobile plant or road vehicle.

This module details the requirements for lifting operations to be carried out:

a) under the control of a competent person (normally a crane controller or crane supervisor); and

b) in accordance with a safe system of work which includes a lift plan.

It details the responsibilities of key personnel and provides recommendations for safe working on site. It includes specific requirements for tandem lifting, lifting track panels, lifting with flexible intermediate bulk containers, and lifting with magnets.

See the index of NR/L2/RMVP/0200 for information on which:

a) specific roles this module applies to; and

b) modules that also apply to those roles.

This module does not apply to MEWPs, see NR/L2/RMVP/0200/P508.

This module defines the requirements for a documented lift.

This module applies to all organisations involved with the planning or supply of plant, and those carrying out or controlling plant operations on Network Rail managed infrastructure and Network Rail projects.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) failure of plant or its control or safety systems;

b) operating error, operational error or equipment misuse;

c) poor site or weather conditions;

d) incorrect lifting operations (LOLER);

e) lack of RIDDOR or close call reporting; and

f) lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.

g) compliance with legislation (LOLER, PUWER, HASAW);

h) damage to assets, e.g. RRV or its load hitting a passing train during ALO operation;

i) overturning, e.g. RRV overturning during lifting operations;

j) MEWPs becoming out of control, e.g. MEWP operator being crushed under a structure; and

k) collisions, e.g. collision between a RRV and an OTM; staff injuries, e.g. Operator.


Edition : 4
File Size : 1 file , 640 KB
Number of Pages : 25
Published : 12/01/2018

History

NR NR/L2/RMVP/0200/P503 ISSUE 5
Published Date: 06/04/2022
Infrastructure Plant Manual: Lifting Operations
$18.6
NR NR/L2/RMVP/0200/P503 ISSUE 4
Published Date: 12/01/2018
Infrastructure Plant Manual: Lifting Operations
$18.6

Related products

NR BRS-SM 2331 ISSUE B
Published Date: 10/14/1993
Supplementary Drive Connection Rod Assembly for 1st Stretcher Bar to Crank on UIC-54 Plain Lead Layouts
$5.7
NR TI 000 ISSUE 36
Published Date: 09/03/2022
Current Index of Technical Instructions Contained in NR/L2/SIG/11120
$7.5
NR X82041 ISSUE 1
Published Date: 06/07/2003
MCB-CCTV Typical Circuits CCTV Transmission Cubicle Fibre Optic Transmission - Internal Wiring
$5.7
NR NR/L3/MTC/0009 ISSUE 4
Published Date: 09/05/2009
Risk Control Sheet Manual: OLE
$7.5

Best-Selling Products

ISO/CIE 10526:1999
Published Date: 10/01/1999
CIE standard illuminants for colorimetry
$18.3
ISO/CIE 10527:1991
Published Date: 10/01/1991
CIE standard colorimetric observers
$27.6
ISO/CIE 11664-1:2019
Published Date: 06/01/2019
Colorimetry - Part 1: CIE standard colorimetric observers
$48.6
ISO/CIE 11664-1:2019
Published Date: 07/01/2019
Colorimetry - Part 1: CIE standard colorimetric observers
$39.24
ISO/CIE 11664-2:2022
Published Date: 08/31/2022
Colorimetry - Part 2: CIE standard illuminants
$52.5
ISO/CIE 11664-2:2022
Published Date: 09/01/2022
ISO/CIE 11664-2 Colorimetry - Part 2: CIE standard illuminants
$44.145