NR NR/L2/RMVP/0200/P503 ISSUE 5 PDF

NR NR/L2/RMVP/0200/P503 ISSUE 5 PDF

Name:
NR NR/L2/RMVP/0200/P503 ISSUE 5 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Infrastructure Plant Manual: Lifting Operations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module applies to all lifting operations carried out on Network Rail managed infrastructure and Network Rail projects when using on-track machines, on-track plant or any non-rail mounted mobile plant or road vehicle.

This module details the requirements for lifting operations to be carried out:

a) under the control of a competent person (normally a crane controller or crane supervisor); and

b) in accordance with a safe system of work which includes a lift plan.

It details the responsibilities of key personnel and provides recommendations for safe working on site. It includes specific requirements for multiple lifting, lifting track panels, lifting with flexible intermediate bulk containers, and lifting with magnets.

See the index of NR/PLANT/0200 for information on which:

a) specific roles this module applies to; and

b) modules that also apply to those roles.

This module does not apply to MEWPs, see NR/PLANT/0200/modules P508.

This module defines the requirements for a documented lift.

This module applies to all organisations involved with the planning or supply of plant, and those carrying out or controlling plant operations on Network Rail managed infrastructure and Network Rail projects.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) failure of plant or its control or safety systems;

b) operating error, operational error or equipment misuse;

c) poor site or weather conditions;

d) incorrect lifting operations (LOLER);

e) lack of RIDDOR or close call reporting; and

f) lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.

g) compliance with legislation (LOLER, PUWER, HASAW);

h) damage to assets, e.g. RRV or its load hitting a passing train during ALO operation;

i) overturning, e.g. RRV overturning during lifting operations;

j) MEWPs becoming out of control, e.g. MEWP operator being crushed under a structure; and

k) collisions, e.g. collision between a RRV and an OTM; staff injuries, e.g. Operator.


Edition : 5
File Size : 1 file , 350 KB
Number of Pages : 22
Published : 06/04/2022

History

NR NR/L2/RMVP/0200/P503 ISSUE 5
Published Date: 06/04/2022
Infrastructure Plant Manual: Lifting Operations
$18.6
NR NR/L2/RMVP/0200/P503 ISSUE 4
Published Date: 12/01/2018
Infrastructure Plant Manual: Lifting Operations
$18.6

Related products

NR NR/L2/SIG/30014/D120/TS12-02 ISSUE 1
Published Date: 06/01/2012
Signalling Works Testing: SSI Data Link Test Specification
$13.2
NR X31110
Published Date: 02/04/1995
AOCL STANDARDS C/D RAIL SIGNAL CIRCUITS DOUBLE LINE BI-DIRECTIONAL
$5.7
NR NR/L2/CTM/222 ISSUE 1
Published Date: 12/04/2010
Competence and Training in Track Welding, Weld Inspection and Ancillary Processes
$24.3
NR R28050 ISSUE 2
Published Date: 06/20/2009
Route Relay Interlocking Typical Circuits Signals & Indicators Banner Repeater Fibre Optic Type; Single; Proving Through Circuits
$5.7

Best-Selling Products

AI IS-180
Published Date:
Safe Storage & Handling of Hot Asphalt
AI MS-01
Published Date: 1999
Thickness Design--Asphalt (Ninth Edition, Reprinted 1999)
AI MS-10
Published Date: 1997
Soils Manual - Fifth Edition
AI MS-11
Published Date:
Thickness Design - Asphalt Pavements for Air Carrier Airports - Third Edition
AI MS-12
Published Date: 1979
Asphalt Hydraulics - Second Edition
AI MS-16
Published Date: 2009
Asphalt in Pavement Preservation and Maintenance