NR NR/L2/RMVP/0200/P505 ISSUE 4 PDF

NR NR/L2/RMVP/0200/P505 ISSUE 4 PDF

Name:
NR NR/L2/RMVP/0200/P505 ISSUE 4 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Infrastructure Plant Manual: Safe Working with Plant

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module applies to:

a) those undertaking Principal Contractor duties to be licensed as set out in NR/L2/INI/CP0070

b) all organisations involved with the planning or supply of plant

c) those carrying out or controlling plant operations on Network Rail-managed infrastructure (NRMI) and Network Rail (NR) projects.

It defines requirements to:

a) manage employees who undertake safety critical work

b) create and accept a Safe System of Work (SSOW)

c) use appropriate communications and lighting systems on site

d) mitigate hazards that arise when using plant

e) prevent damage to the infrastructure during work operations

f) protect against hazards arising from the infrastructure or environmental conditions when using plant.

See the index of NR/L2/RMVP/0200 for information on which:

a) specific roles this module applies to; and

b) modules that also apply to those roles.

Purpose

This module manages controls relating to these risks:

a) failure of plant or its control or safety systems

b) operating error, operational error or equipment misuse

c) multiple plant movement and collisions

d) poor site or weather conditions

e) incorrect lifting operations (LOLER)

f) lack of RIDDOR or close call reporting

g) lack of continuous improvement such as mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 4
File Size : 1 file , 320 KB
Number of Pages : 18
Published : 06/04/2022

History

NR NR/L2/RMVP/0200/P505 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Safe Working with Plant
$13.2
NR NR/L2/RMVP/0200/P505 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Safe Working with Plant
$13.2

Related products

NR NR/L2/SIG/11752/PART E ISSUE 2
Published Date: 08/01/2001
Train Detection Handbook Part E: Wheel Detector Configuration Parameters
$7.5
NR NR/L2/ADG/002/02 ISSUE 1
Published Date: 12/03/2016
Asset Data Governance Framework Manual: Data Architecture Management
$7.5
NR NR/L3/MTC/II0219/05 ISSUE 1
Published Date: 09/04/2010
Maintenance of Assets Fitted with Remote Condition Monitoring
$7.5
NR AWS 19
Published Date: 11/01/1978
AWS Re-set Plunger
$5.7

Best-Selling Products

I3A IT1.80-1995
Published Date: 10/27/1997
Photography (Photofinishing) - Identification of Customer Order Components - Automatic Matching in a Centralized Photofinishing Plant
I3A IT10.2000-2004
Published Date: 04/16/2004
Photography - Digital still cameras - JPEG 2000 DSC profile
I3A IT10.7000-2004
Published Date: 06/24/2004
Photography - Digital Still Cameras - Guidelines for Reporting Pixel-Related Specifications
I3A IT10.7466-2002
Published Date: 07/17/2002
Photography - Electronic still picture imaging - Reference Input Medium Metric RGB Color encoding (RIMM-RGB)
I3A IT10.7666-2002
Published Date: 07/18/2002
Photography - Electronic Still Picture Imaging - Reference Output Medium Metric RGB Color Encoding (ROMM-RGB)
I3A IT12.1-1994
Published Date: 07/24/1995
Photography (Imaging Materials) - 135-Size Film Canister Bottoms - Composition