NR NR/L2/RMVP/0200/P506 ISSUE 3 PDF

NR NR/L2/RMVP/0200/P506 ISSUE 3 PDF

Name:
NR NR/L2/RMVP/0200/P506 ISSUE 3 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Infrastructure Plant Manual: On-Track Machines

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module defines the requirements for using on-track machines (OTM) including:

a) setting up appropriate exclusion zones;

b) working under live overhead line equipment, including third-party lines;

c) operating an OTM both within and outside a possession; and

d) the actions to be taken before allowing a machine into traffic.

This document applies to organisations involved with the following:

a) planning or supply of OTMs; and

b) carrying out or controlling of operations involving OTMs on Network Rail managed infrastructure and Network Rail projects.

This module also applies to rail vehicles on which plant is mounted (wagons).

Purpose

The implementation of this module contributes to mitigating the following risks:

a) compliance with legislation (LOLER, PUWER, HASAW);

b) damage to assets, e.g. RRV or its load hitting a passing train during ALO operation;

c) runaway/failure to stop on demand, e.g. OTP running away on a gradient;

d) derailment, e.g. trailer being loaded incorrectly; and

e) staff injuries, e.g. Operator being trapped between machine and infrastructure or machine and machine.


Edition : 3
File Size : 1 file , 320 KB
Number of Pages : 8
Published : 12/01/2018

History

NR NR/L2/RMVP/0200/P506 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: On-Track Machines
$7.5
NR NR/L2/RMVP/0200/P506 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: On-Track Machines
$7.5

Related products

NR NR/SP/ELP/21107 ISSUE 2
Published Date: 04/01/2006
Bolted Running Rail Connections for Traction Bonding on AC and DC Electrified Lines
$13.2
NR NR/GN/SIG/02022 ISSUE 2
Published Date: 12/03/2005
Requirements for TASS Infrastructure - System Description
$18.6
NR NR/CIV/SD/1017 ISSUE C
Published Date: 09/02/2017
Double Track - 2 Girder Inspection Units Sheet 2 of 2
$5.7
NR NR/CIV/SD/1250 ISSUE E
Published Date: 12/01/2018
Z-Type Underbridges: Steelwork Protective Treatment: Notes
$5.7

Best-Selling Products

Tracking R & D : Research & Development
Published Date: 01/01/1992
$8.7