Name:
NR NR/L2/RMVP/0200/P510 ISSUE 2 PDF
Published Date:
06/03/2017
Status:
[ Withdrawn ]
Publisher:
Network Rail
This module describes available quick hitch systems and their requirements when they are used as lifting equipment installed on a machine.
It specifies the requirements for the:
a) labelling of machines with quick hitch systems; and
b) connection compatibility arrangements between the quick hitch system and attachments.
This module applies to all organisations involved with:
a) planning or supply of any quick hitch system;
b) carrying out or controlling operations using quick hitch systems; and
c) maintaining quick hitch systems used on Network Rail managed infrastructure (NRMI) and Network Rail projects. See the index of NR/L2/RMVP/0200 for information on which
a) specific roles this module applies to; and
b) modules that also apply to those roles.
Purpose
The implementation of this module contributes to mitigating the following risks:
a) failure of plant or its control or safety systems;
b) operating error, operational error or equipment misuse;
c) poor site or weather conditions;
d) incorrect lifting operations (LOLER);
e) lack of RIDDOR or close call reporting; and
f) lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.
| Edition : | 2 |
| File Size : | 1 file , 500 KB |
| Number of Pages : | 11 |
| Published : | 06/03/2017 |