NR NR/L2/RMVP/0200/P511 ISSUE 3 PDF

NR NR/L2/RMVP/0200/P511 ISSUE 3 PDF

Name:
NR NR/L2/RMVP/0200/P511 ISSUE 3 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Infrastructure Plant Manual: Vegetation Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module defines the requirements for developing a safe system of work for vegetation management operations. It includes:

a) requirements to plan all work and to mitigate potential hazards;

b) guidance on selecting the right machines;

c) carrying out or controlling operations using powered cutters or saws; and

d) requirements that a site visit is carried out prior to starting any work.

This module applies to all flailing and mulching operations carried out on Network Rail managed infrastructure (NRMI) and Network Rail projects when using on-track plant or any non-rail mounted mobile plant.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) failure of plant or its control or safety systems;

b) operating error, operational error or equipment misuse;

c) poor site or weather conditions;

d) incorrect lifting operations (LOLER);

e) lack of RIDDOR or close call reporting; and

f) a lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 3
File Size : 1 file , 800 KB
Number of Pages : 12
Published : 12/01/2018

History

NR NR/L2/RMVP/0200/P511 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Vegetation Management
$13.2
NR NR/L2/RMVP/0200/P511 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Vegetation Management
$13.2

Related products

NR NR/L3/MTC/RCS0216/MAT01 ISSUE 2
Published Date: 06/05/2021
Risk Control Manual: Unloading Ballast from Sidetipper or Autoballaster
$5.7
NR X08510 ISSUE 1
Published Date: 02/06/1999
AHBC Typical Circuits Flasher Circuits (for use when an Additional Flasher is required)
$5.7
NR NR/L3/ELP/27052 ISSUE 8
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line
$13.2
NR BRS-SM 440/U4 ISSUE C
Published Date: 08/10/1994
Signalling Equipment Framework Small 10XBS88 Fuseholder Rail for Apparatus Cases and REB's
$5.7

Best-Selling Products