Name:
NR NR/L2/RMVP/0200/P511 ISSUE 4 PDF
Published Date:
06/04/2022
Status:
[ Active ]
Publisher:
Network Rail
This module defines the requirements for developing a safe system of work for vegetation management operations. It includes:
a) requirements to plan all work and to mitigate potential hazards;
b) guidance on selecting the right machines;
c) carrying out or controlling operations using powered cutters or saws; and
d) requirements that a site visit is carried out prior to starting any work.
This module applies to all flailing and mulching operations carried out on Network Rail managed infrastructure (NRMI) and Network Rail projects when using on-track plant or any non-rail mounted mobile plant.
NOTE: This module should be read in conjunction with NR/L2/OTK/5201.
Purpose
The implementation of this module contributes to mitigating the following risks:
a) failure of plant or its control or safety systems;
b) operating error, operational error or equipment misuse;
c) poor site or weather conditions;
d) incorrect lifting operations (LOLER);
e) lack of RIDDOR or close call reporting; and
f) a lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.
| Edition : | 4 |
| File Size : | 1 file , 550 KB |
| Number of Pages : | 11 |
| Published : | 06/04/2022 |