NR NR/L2/RMVP/0200/P511 ISSUE 4 PDF

NR NR/L2/RMVP/0200/P511 ISSUE 4 PDF

Name:
NR NR/L2/RMVP/0200/P511 ISSUE 4 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Infrastructure Plant Manual: Vegetation Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module defines the requirements for developing a safe system of work for vegetation management operations. It includes:

a) requirements to plan all work and to mitigate potential hazards;

b) guidance on selecting the right machines;

c) carrying out or controlling operations using powered cutters or saws; and

d) requirements that a site visit is carried out prior to starting any work.

This module applies to all flailing and mulching operations carried out on Network Rail managed infrastructure (NRMI) and Network Rail projects when using on-track plant or any non-rail mounted mobile plant.

NOTE: This module should be read in conjunction with NR/L2/OTK/5201.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) failure of plant or its control or safety systems;

b) operating error, operational error or equipment misuse;

c) poor site or weather conditions;

d) incorrect lifting operations (LOLER);

e) lack of RIDDOR or close call reporting; and

f) a lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 4
File Size : 1 file , 550 KB
Number of Pages : 11
Published : 06/04/2022

History

NR NR/L2/RMVP/0200/P511 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Vegetation Management
$13.2
NR NR/L2/RMVP/0200/P511 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Vegetation Management
$13.2

Related products

NR BRS-SE 95
Published Date: 07/05/1973
COLOUR LIGHT SIGNALS INVERTED TORIC LENS 139mm (12 PRISM RINGS) FOR DOUBLET COMBINATION
$5.7
NR NR/WI/ELP/27231 ISSUE 1
Published Date: 12/01/2005
Work Instruction for Operation of 11kV Supplies at Slade Green Depot, Ashford IECC and Victoria Station
$13.2
NR NR/CIV/SD/4230 ISSUE A
Published Date: 03/07/2020
Ribbon Covered Footbridge Series 4200: Deck Level General Arrangement
$5.7
NR TI 025 ISSUE 1
Published Date: 02/01/2006
TPWS Loop Positioning - Buffer Stops
$5.7

Best-Selling Products

3D Computer Graphics
Published Date: 12/06/1999
$18
Advanced Calculus
Published Date: 09/01/1999
$33.3
Advanced Engineering Mathematics
Published Date: 11/13/2000
$36.9
Crafting a Compiler with C
Published Date: 07/01/1991
$29.4
Mathematica for Calculus-Based Physics
Published Date: 01/07/1999
$8.1