NR NR/L2/RMVP/0200/P516 ISSUE 2 PDF

NR NR/L2/RMVP/0200/P516 ISSUE 2 PDF

Name:
NR NR/L2/RMVP/0200/P516 ISSUE 2 PDF

Published Date:
06/03/2017

Status:
[ Withdrawn ]

Description:

Infrastructure Plant Manual: Undertaking Lifting Operations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This module applies to all lifting operations carried out on Network Rail managed infrastructure and Network Rail projects when using on-track machines, on-track plant or any non-rail mounted mobile plant or road vehicle.

This module details the requirements for lifting operations to be carried out:

a) under the control of a competent person (normally a crane controller or crane supervisor); and

b) in accordance with a safe system of work which includes a lift plan.

It details the responsibilities of key personnel and provides recommendations for safe working on site. It includes specific requirements for tandem lifting, lifting track panels, lifting with flexible intermediate bulk containers, and lifting with magnets.

See the index of NR/L2/RMVP/0200 for information on which:

a) specific roles this module applies to; and

b) modules that also apply to those roles. This module does not apply to MEWPs, see NR/L2/RMVP/0200/modules P503 and P508.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) failure of plant or its control or safety systems;

b) operating error, operational error or equipment misuse;

c) poor site or weather conditions;

d) incorrect lifting operations (LOLER);

e) lack of RIDDOR or close call reporting; and

f) lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 2
File Size : 1 file , 390 KB
Number of Pages : 18
Published : 06/03/2017

History


Related products

NR NR/SIG/10665/MOD 029 ISSUE 1
Published Date: 12/07/2013
Reliability Centred Maintenance of Signalling Equipment (ROSE) - Point Operating Equipment - HW1000 / HW2000 Service B (NR/ROSE/PO-B3/1)
$5.7
NR RT/LS/S/001 ISSUE 2
Published Date: 01/01/1997
Content and Format of Railtrack Line Controlled Documents
$7.5
NR NR/SIN/209 ISSUE 1
Published Date: 06/13/2022
Regulatory Requirements for PCB Contaminated Equipment
$18.6
NR NR/L2/OHS/019/BRIEFING ISSUE 2
Published Date: 06/14/2017
Safety of People at Work on or Near the Line - Briefing
$5.7

Best-Selling Products