NR NR/SIN/209 ISSUE 1 PDF

NR NR/SIN/209 ISSUE 1 PDF

Name:
NR NR/SIN/209 ISSUE 1 PDF

Published Date:
06/13/2022

Status:
[ Withdrawn ]

Description:

Regulatory Requirements for PCB Contaminated Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

The scope of NR/SIN/209 is to calculate and record the total volume of PCBs (ml) for each item of electrification and plant (E&P) transformer equipment that requires inclusion in Network Rail’s (NR’s) PCB register or is already registered with the Environment Agency (EA) or Scotland’s Environment Protection Agency (SEPA)).

The scope also includes the identification for removal or decontamination of any assets containing more than 50ml of PCBs.

NOTE 1 Individual Routes’ PCB Registers are available in the “Module” Section of NR/SIN/209 on NR’s Standards & Controls website.

Purpose 

The purpose of this Special Inspection Notice (SIN) is to support Network Rail’s compliance with the following PCB regulations (PCB Regs): 

The Environmental Protection (Disposal of Polychlorinated Biphenyls and other Dangerous Substances) (England and Wales) (Amendment) Regulations 2020 (2020 No. 489) 

The Environmental Protection (Disposal of Polychlorinated Biphenyls and other Dangerous Substances) (Scotland) Amendment Regulations 2020 (2020 No.434)


Edition : 1
File Size : 1 file , 780 KB
Number of Pages : 21
Published : 06/13/2022

History


Related products

NR BRS-SE 165/2 ISSUE B
Published Date: 02/06/1981
Position Light Signal Lens Conversion Kit Shield for Ml Style 1 Signal
$5.7
NR X30450
Published Date: 02/04/1995
AOCL STANDARDS CONTROL CIRCUITS (1) SINGLE LINE
$5.7
NR NR/SIG/10665/MOD 017 ISSUE 1
Published Date: 03/02/2013
Reliability Centred Maintenance of Signalling Equipment (ROSE) - Miniature Stop Light Crossing (MSL) Test Plan (NR/ROSE/LX74/1)
$7.5
NR BRS-SE 187/4 ISSUE B
Published Date: 09/08/1992
Pedestrian Signal for Level Crossings Screen Ring for 'Standing Man' Sign Assembly
$5.7

Best-Selling Products

FCI 13-1-2022
Published Date: 2022
Determining Condensate Loads to Size Steam Traps
$66
FCI 15-1-2020
Published Date: 2020
Standard for Production Testing of Pressure Regulators
$49.5
FCI 17-1-2018
Published Date: 10/01/2018
Standard for Production Testing of Sanitary Pressure Regulators
$33
FCI 18-1-2021
Published Date: 2021
Standard for Sizing and Selection of Type 1 Secondary Pressure Drainers
$33
FCI 18-2-2020
Published Date: 2020
Standard for Installation of Type 1 Secondary Pressure Drainers
$33