NR NR/L2/RMVP/0200/P521 ISSUE 3 PDF

NR NR/L2/RMVP/0200/P521 ISSUE 3 PDF

Name:
NR NR/L2/RMVP/0200/P521 ISSUE 3 PDF

Published Date:
12/01/2018

Status:
[ Active ]

Description:

Infrastructure Plant Manual: On-Track Plant Operations Scheme

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module defines the on-track plant operations scheme (POS) for the provision and operation of OTP on Network Rail managed infrastructure (NRMI) and Network Rail projects.

This document applies to organisations carrying out OTP operations on NRMI and Network Rail projects. The following are pre-requisites for compliance with the POS:

a) safe use of plant for infrastructure work, as set out in this manual NR/L2/RMVP/0200;

b) product introduction and change, as set out in NR/L2/RSE/100/05;

c) engineering acceptance, as set out in RIS-1530-PLT; and

d) specific rules controlled through the Sentinel scheme.

Arrangements for the operation of on-track machines (OTM), portable and transportable plant, whether operating inside or outside of a possession, are outside the scope of this module

The Network Rail POS review panel act as the owners and administrators of the POS.

Purpose

The application of this module contributes to the control of the following risks:

a) risk of runaway, uncontrolled movement and collisions by on–track plant (OTP) with infrastructure, workforce or other vehicles;

b) risk of personal injury within a worksite: slips, trips and falls, struck by OTP; and

c) risk of implementing ineffective management control and supervision of OTP operations


Edition : 3
File Size : 1 file , 420 KB
Number of Pages : 22
Published : 12/01/2018

History


Related products

NR E10000/123/2 ISSUE B
Published Date: 03/20/1980
Time Relays - Use of Thermal Relay to B.R. Spec. 937A
$5.7
NR T60225 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits TPWS - OSS Function (Complex Approach) Normal Direction (Down). Direction of Travel - Down Acc: Relay Interface Location Case Circuit
$5.7
NR NR/L3/ELP/27240/NR/DIST C25R ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of DC High Speed Circuit Breakers Bertram Thomas Type HSE Installed at West End Lane and Bushley Substations
$5.7
NR NR/L2/SIG/30014/G130/SG52 ISSUE 1
Published Date: 09/03/2011
Fitment of LED MSLs
$5.7

Best-Selling Products

IGEM UP/2
Published Date: 06/01/2014
Installation pipework on industrial and commercial premises