Name:
NR NR/L3/ELP/27240/NR/DIST C25R ISSUE 2 PDF
Published Date:
03/01/2017
Status:
[ Active ]
Publisher:
Network Rail
Includes: This instruction covers the procedure for the routine maintenance of DC HSCB Bertram Thomas Type HSE installed at West End and Bushley Substations.
Frequency of inspection shown shall be regarded as the minimum, but may be increased at the discretion of the local engineer where conditions require it.
| Edition : | 2 |
| File Size : | 1 file , 69 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2017 |