NR NR/L3/ELP/27240/NR/DIST C25R ISSUE 2 PDF

NR NR/L3/ELP/27240/NR/DIST C25R ISSUE 2 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C25R ISSUE 2 PDF

Published Date:
03/01/2017

Status:
[ Active ]

Description:

Routine Maintenance of DC High Speed Circuit Breakers Bertram Thomas Type HSE Installed at West End Lane and Bushley Substations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
NR/L3/ELP/27240/NR/DIST C25R

Includes: This instruction covers the procedure for the routine maintenance of DC HSCB Bertram Thomas Type HSE installed at West End and Bushley Substations.

Frequency of inspection shown shall be regarded as the minimum, but may be increased at the discretion of the local engineer where conditions require it.


Edition : 2
File Size : 1 file , 69 KB
Number of Pages : 3
Published : 03/01/2017

History


Related products

NR NR/L3/SCO/311/16 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Management of Safety Related Components
$18.6
NR BR 825 ISSUE 1
Published Date: 08/01/1976
Specification for Closed Circuit Television High Frequency (HF) Transmission Equipment
$13.2
NR X70175 ISSUE 3
Published Date: 04/02/2005
MCB Typical Circuits Road Light Circuits (2)
$5.7
NR NR/L3/SIG/11761/D210 ISSUE 1
Published Date: 03/31/2010
EBI Track 200 Track Circuit Condition Monitoring
$13.2

Best-Selling Products