Name:
NR NR/L2/RMVP/0200/P701 ISSUE 2 PDF
Published Date:
06/03/2017
Status:
[ Withdrawn ]
Publisher:
Network Rail
This module details specific minimum maintenance requirements for on-track plant (OTP) used on Network Rail managed infrastructure (NMRI) and Network Rail projects (NR projects).
This module applies to organisations that are involved with any of the following:
a) manufacture or supply of OTP;
b) carrying out or controlling operations using OTP; and
c) maintenance of OTP used on NRMI and NR projects.
NOTE: Maintenance activities included within individual vehicle maintenance plans should be equivalent to, or better than, the requirements of this module.
See the index of NR/L2/RMVP/0200 for information on which:
a) specific roles this module applies to; and
b) modules that also apply to those roles.
Purpose
The implementation of this module contributes to mitigating the following risks:
a) failure of plant or its control or safety systems;
b) operating error, operational error or equipment misuse;
c) multiple plant movement;
d) poor site or weather conditions;
e) incorrect lifting operations (LOLER);
f) lack of RIDDOR or close call reporting; and
g) lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.
| Edition : | 2 |
| File Size : | 1 file , 320 KB |
| Number of Pages : | 13 |
| Published : | 06/03/2017 |