NR NR/L2/RMVP/0200/P701 ISSUE 2 PDF

NR NR/L2/RMVP/0200/P701 ISSUE 2 PDF

Name:
NR NR/L2/RMVP/0200/P701 ISSUE 2 PDF

Published Date:
06/03/2017

Status:
[ Withdrawn ]

Description:

Infrastructure Plant Manual: On-Track Plant Maintenance

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This module details specific minimum maintenance requirements for on-track plant (OTP) used on Network Rail managed infrastructure (NMRI) and Network Rail projects (NR projects).

This module applies to organisations that are involved with any of the following:

a) manufacture or supply of OTP;

b) carrying out or controlling operations using OTP; and

c) maintenance of OTP used on NRMI and NR projects.

NOTE: Maintenance activities included within individual vehicle maintenance plans should be equivalent to, or better than, the requirements of this module.

See the index of NR/L2/RMVP/0200 for information on which:

a) specific roles this module applies to; and

b) modules that also apply to those roles.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) failure of plant or its control or safety systems;

b) operating error, operational error or equipment misuse;

c) multiple plant movement;

d) poor site or weather conditions;

e) incorrect lifting operations (LOLER);

f) lack of RIDDOR or close call reporting; and

g) lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 2
File Size : 1 file , 320 KB
Number of Pages : 13
Published : 06/03/2017

History

NR NR/L2/RMVP/0200/P701 ISSUE 2
Published Date: 06/03/2017
Infrastructure Plant Manual: On-Track Plant Maintenance
$13.2
NR NR/PLANT/0200/P701 ISSUE 1
Published Date: 03/02/2013
Infrastructure Plant Manual: On Track Plant Maintenance
$7.5

Related products

NR NR/L2/RMVP/0139 ISSUE 1
Published Date: 12/05/2009
Design & Installation of Traversers
$13.2
NR X80300 ISSUE 2
Published Date: 06/07/2003
MCB-CCTV Typical Circuits Camera Control Circuits (1) CCD Cameras as Standard
$5.7
NR NR/L3/CIV/065/MOD04 ISSUE 1
Published Date: 09/02/2017
Examination of Earthworks Manual: Definition of Soil Embankment Hazard Index
$18.6
NR NR/L3/SIG/30075 ISSUE 2
Published Date: 03/03/2012
Production of Non-Conceptual Signalling Design
$18.6

Best-Selling Products

NMEA 0183
Published Date: 01/01/2002
NMEA Standard for Interfacing Marine Electronic Devices, Version 3.01