NR NR/L2/RSE/015 ISSUE 6 PDF

NR NR/L2/RSE/015 ISSUE 6 PDF

Name:
NR NR/L2/RSE/015 ISSUE 6 PDF

Published Date:
08/26/2008

Status:
[ Inactive ]

Description:

Acceptance Panel (aka NR/CS/ACC/015 or NR/SP/ACC/015)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INAC * PDF ONLY

NRAP's activities detailed in this standard include all programmes, projects or activities which include one or more of the following attributes:-

a) Introduce into operation new or changed vehicles on NR Infrastructure, or changes the geographical limits (as defined by the authorised routes) over which such vehicles operate, or

NOTE: The NR Infrastructure is defined as the track, the means of supporting the track, the signalling arrangements, and the traction power supply system and "managed" stations – but not "leased" stations.

b) Has the potential to affect the interaction between railway vehicles and NR Infrastructure.

c) Is a change to NR Infrastructure (whether by renewal in modern equivalent form, or by a change in functionality of the Infrastructure) or

Note: The scope of NRAP activity does not normally include maintenance renewals of equipment, or the substitution of equipment in the course of failure rectification, and on the basis those activities use approved equipment in pre-existing applications, that no designs are produced in support of such activities and they do not change the configuration of NR infrastructure.

d) Has the potential to change the risk profile of NR Infrastructure, or

e) Intends to Introduce new or changed products as part of NR Infrastructure

f) NRAP considers, at its discretion, appears to be of a sufficient risk profile to warrant its involvement

and irrespective of whether that programme or project is actually under the control of, or carried out by, NR.

The scope includes NRAP's arrangements for determining the appropriate level of scrutiny to be given to any such qualifying activity, and those dependent processes by which NRAP discharges its accountabilities.


Edition : 6
File Size : 1 file , 630 KB
Number of Pages : 23
Published : 08/26/2008

History


Related products

NR NR/L3/MTC/ME0201/CAL299 ISSUE 1
Published Date: 06/07/2008
Calibration of Megger BM80 Series Digital Insulation & Continuity Testers
$5.7
NR X42320 ISSUE 2
Published Date: 09/05/2009
Wicket Gate Typical Circuits Magnetic Lock Crossing Operators Indication Unit Wiring and FacePlate Detail
$5.7
NR NR/L2/ADG/002/08 ISSUE 1
Published Date: 12/03/2016
Asset Data Governance Framework Manual: Data Quality Measurement
$7.5
NR NR/L3/SIG/11303/2G05 ISSUE 5
Published Date: 12/03/2016
Signalling Installation: Locations: Construction
$13.2

Best-Selling Products

FAO/WHO FAO8876
Published Date: 01/01/2003
Food Quality and Safety Systems: A Training Manual on Food Hygiene and the Hazard Analysis and Critical Control Point (HACCP) System
$15