NR NR/L2/RSE/100/07 ISSUE 4 PDF

NR NR/L2/RSE/100/07 ISSUE 4 PDF

Name:
NR NR/L2/RSE/100/07 ISSUE 4 PDF

Published Date:
06/01/2024

Status:
[ Active ]

Description:

Network Rail Assurance Panel Processes: System Review Panels

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module specifies the process, delegated responsibilities and administration arrangements of System Review Panels within Network Rail. It also specifies their key interfaces.

SRPs are change review bodies. They are not responsible for sponsoring change.

SRPs do not review documents dealing with the management of risks only extant during project implementation.


Edition : 4
File Size : 2 files , 660 KB
Number of Pages : 10
Published : 06/01/2024

History

NR NR/L2/RSE/100/07 ISSUE 4
Published Date: 06/01/2024
Network Rail Assurance Panel Processes: System Review Panels
$13.2
NR NR/L2/RSE/100/07 ISSUE 3
Published Date: 06/01/2019
Network Rail Assurance Panel Processes: System Review Panels
$13.2
NR NR/L2/RSE/100/07 ISSUE 2
Published Date: 12/05/2015
Network Rail Assurance Panel Processes: System Review Panels
$13.2
NR NR/L2/RSE/100/07 ISSUE 1
Published Date: 12/03/2011
Acceptance Panel Processes: System Review Panels
$7.5

Related products

NR NR/L3/SCO/311/20 ISSUE 1
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Handover and Handback of Rail Vehicles
$13.2
NR X01050 ISSUE 3
Published Date: 08/07/2004
AHBC Typical Circuits Double Line Bi-Directional Control Circuits (3)
$5.7
NR NR/EPF/OLE/012 ISSUE 2
Published Date: 08/01/2015
High Level Intrusive Inspection Record Sheet
$5.7
NR NR/CIV/SD/2172-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 9.4m Concrete Parapet Beam Right Skew 45º
$5.7

Best-Selling Products

NORSOK C-001:2022
Published Date: 03/21/2022
Living quarters area
NORSOK C-004:2019+AC:2022
Published Date: 10/23/2019
Helicopter deck on offshore installations
NORSOK D-002
Published Date: 01/13/2020
Well intervention equipment
NORSOK D-007
Published Date: 03/26/2021
Well testing, clean-up and flowback systems
NORSOK D-010:2021+AC2:2021
Published Date: 12/23/2021
Well integrity in drilling and well operations
NORSOK D-010/AC:2021
Published Date: 06/23/2021
CORRIGENDUM: Well integrity in drilling and well operations