NR NR/L2/RSK/001 ISSUE 3 PDF

NR NR/L2/RSK/001 ISSUE 3 PDF

Name:
NR NR/L2/RSK/001 ISSUE 3 PDF

Published Date:
09/07/2019

Status:
[ Active ]

Description:

Enterprise Risk Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This process applies to all parts of the business that own and / or manage Level 0 to Level 2 enterprise risks as shown in Figure 1.

Purpose

This process sets out a principle-based approach for the management of Enterprise Risks in Network Rail to enable:

a) the effective and consistent management of all risks to strategic objectives;

b) risks to be managed in accordance with NR/L1/RSK/001 and Board approved corporate risk appetite statements;

c) the identification, prioritisation and management of interrelated enterprise risks to support successful delivery of the Company’s strategic objectives;

d) strategic objectives to be managed in accordance with the UK Corporate Governance Code and governance requirements under licence condition 15 of

the Network Licence; and

e) clarity on risks which Network Rail have responsibility to manage as part of a wider set of industry risk mitigation activity.

NOTE: Strategic objectives includes network-level objectives such as those governed by the National Strategy Committees. These are the highest-level specific corporate objectives, typically of a timescale of the current or following control period. Each objective can be traced back up to Network Rail’s role, purpose and vision.


Edition : 3
File Size : 1 file , 710 KB
Number of Pages : 27
Published : 09/07/2019

History

NR NR/L2/RSK/001 ISSUE 3
Published Date: 09/07/2019
Enterprise Risk Management
$18.6
NR NR/L2/RSK/001 ISSUE 2
Published Date: 09/01/2018
Enterprise Risk Management
$18.6

Related products

NR NR/L3/MTC/RCS0216/OT11 ISSUE 3
Published Date: 03/03/2012
Risk Control Manual: Maintain Vegetation - Manual Tree Climbing
$5.7
NR BRS-SM 517/7 ISSUE A
Published Date: 09/12/1990
Rail Clamp Point Lock Packing Plate (Switch Diamonds)
$5.7
NR NR/L3/OPS/045/3.07 ISSUE 2
Published Date: 06/02/2018
National Operating Procedure (NOP) 3.07: Signalling System Failures, Lineside Safety Equipment Failures, Track Defects and Receiving and Responding to RT3185 Forms
$13.2
NR BRS-SM 2404 ISSUE A
Published Date: 01/11/1994
Mechanical Point Fittings Drive Rod for UIC-54B Plain Leads
$5.7

Best-Selling Products

ASHRAE/AMCA 51-1999 Addendum a-2001
Published Date: 2001
Addendum a-2001 to Standard 51-1999 -- Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (AMCA Standard 210-99) (ANSI approved)
Free Download
ASHRAE/AMCA 51-1999
Published Date: 1999
Standard 51-1999 -- Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (AMCA Standard 210-99) (ANSI approved)
$21.6
ASHRAE/AMCA 51-2007
Published Date: 2008
Standard 51-2007 -- Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (ANSI/ASHRAE Approved) (ANSI/AMCA Standard 210-07)
$32.7