NR NR/L3/OPS/045/3.07 ISSUE 2 PDF

NR NR/L3/OPS/045/3.07 ISSUE 2 PDF

Name:
NR NR/L3/OPS/045/3.07 ISSUE 2 PDF

Published Date:
06/02/2018

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.07: Signalling System Failures, Lineside Safety Equipment Failures, Track Defects and Receiving and Responding to RT3185 Forms

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This procedure applies to:

a) all Network Rail staff involved with failures of infrastructure equipment;

b) all reported failures or irregularities of the following equipment for which Network Rail is responsible occurring on Network Rail Controlled Infrastructure:

i) signal;

ii) Automatic Warning System (AWS);

iii) Train Protection Warning System (TPWS);

iv) European Rail Traffic Management System (ERTMS);

v) Automatic Train Protection;

vi) Transmission Voice-Machine (TVM).

PURPOSE

This procedure provides a risk based approach to manage incidents involving failures of:

a) signalling equipment;

NOTE: This includes both right side and wrong side failures (WSFs).

b) track defects; and

c) WSFs of lineside safety equipment involving:

i) Track Circuit Operating Device (TCOD);

ii) Lookout Operating Warning System (LOWS); and

iii) Automatic Track Warning System (ATWS).

It sets out the requirements to be agreed between Network Rail and Train Operating Companies (TOCs) and Freight Operating Companies (FOCs) in relation to the receipt and response to form RT3185 for faults for which Network Rail is responsible (as defined in RIS-8047-TOM).

 


Edition : 2
File Size : 1 file , 370 KB
Number of Pages : 13
Published : 06/02/2018

History


Related products

NR NR/L2/SIG/11201/MOD X21 ISSUE 5
Published Date: 12/02/2023
Signalling Design Handbook: Level Crossings - Manually Controlled Barriers with Obstacle Detection
$35.4
NR TWI 2S057 ISSUE 1
Published Date: 03/01/2005
How to Replace a Switch Heater Pad or Cartridge
$5.7
NR NR/L2/ELP/27009/MOD C11 ISSUE 1
Published Date: 12/03/2011
Replacement of Plastic Dropper Sleeves Prone to Ultra Violet Degradation
$5.7
NR RT/E/C/19258 ISSUE 1
Published Date: 06/01/1996
Signalling Equipment Workshop Engineering Notice (SIGWEN007) BR 843 Level Crossing Lifting Barriers (aka NR/GN/SIG/19258)
$7.5

Best-Selling Products

DIN VDI/VDE 3542-1
Published Date: 12/01/1988
Safety Terms for Automation Systems - Blatt 1: Qualitative Terms and Definitions - GERMAN ONLY
DIN VDI/VDE 3542-2
Published Date: 12/01/1988
Safety Terms for Automation Systems - Blatt 2: Quantitative Terms and Definitions - GERMAN ONLY
DIN VDI/VDE 3542-3
Published Date: 09/01/1993
Safety Terms for Automation Systems - Blatt 3: Application Hints and Examples - GERMAN ONLY
DIN VDI/VDE 3542-4
Published Date: 07/01/1995
Safety Terms for Automation Systems - Blatt 4: Reliability & Safety of Complex Systems (terms) - GERMAN ONLY