NR NR/L2/SIG/10027 ISSUE 4 PDF

NR NR/L2/SIG/10027 ISSUE 4 PDF

Name:
NR NR/L2/SIG/10027 ISSUE 4 PDF

Published Date:
12/05/2015

Status:
[ Revised ]

Description:

Surveillance of Signal Engineering Activities

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This business process is limited to surveillance of Network Rail staff performing signal engineering activities, including:

•corrective and preventative maintenance

•equipment replacement/minor works

•SMTH testing

•G110 testing.

Note: Full works testing and design activities, including non-conceptual design, are not covered by this business process.

This process also applies to temporary staff and approved contractors working on behalf of Network Rail Operations (maintenance, delivery services and works delivery), unless they are working under mentorship or assisting a competent person to complete the work and for which the competent person will take responsibility.

Those involved in engineering management activities who may occasionally carry out the activities in 1.2.1 are excluded from the scope of this standard as it is expected that they have demonstrated sufficient expertise in their field to be appointed to these roles (eg, Section Manages or Works Delivery Managers).

Purpose

The business process for surveillance of signal engineering activities:

•provides assurance on staff competency when working on signalling assets

•confirms that work on signalling assets is being completed correctly

•gathers evidence to support IRSE licensing processes.

Failure to adhere to this process could result in a reduction in safety and reliability.


Edition : 4
File Size : 1 file , 300 KB
Number of Pages : 14
Published : 12/05/2015

History

NR NR/L2/SIG/10027 ISSUE 6
Published Date: 06/01/2024
Surveillance of Signal Maintenance Activities
$13.2
NR NR/L2/SIG/10027 ISSUE 5
Published Date: 09/03/2022
Surveillance of Signal Maintenance Activities
$13.2
NR NR/L2/SIG/10027 ISSUE 4
Published Date: 12/05/2015
Surveillance of Signal Engineering Activities
$13.2
NR NR/L2/SIG/10027 ISSUE 3
Published Date: 09/03/2011
Surveillance of Signal Engineering Activities
$7.5

Related products

NR NR/L3/NDS/308/LMB3.4 ISSUE 1
Published Date: 03/01/2012
FDA Steel Sleeper Track Panel
$5.7
NR NR/SIN/173 APPENDIX D ISSUE 1
Published Date: 04/26/2018
Network Rail’s Response to the RAIB's POGO USA - Level Crossing Manager Action Required
$13.2
NR BRS-SM 142 ISSUE A
Published Date: 09/28/1974
Double Flat Frame for 14" Wheel
$5.7
NR X21060 ISSUE 3
Published Date: 08/07/2004
ABCL TYPICAL CIRCUITS SINGLE LINE CONTROL CIRCUITS (1)
$5.7

Best-Selling Products