NR NR/L2/SIG/10027 ISSUE 6 PDF

NR NR/L2/SIG/10027 ISSUE 6 PDF

Name:
NR NR/L2/SIG/10027 ISSUE 6 PDF

Published Date:
06/01/2024

Status:
[ Active ]

Description:

Surveillance of Signal Maintenance Activities

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This document applies to all staff performing Signal Engineering activities holding the occupational competencies shown in Appendix A, at Level 3 or above which include:

a) Corrective and preventative maintenance;

b) Equipment replacement/minor works;

c) Signal Maintenance Testing;

d) Signal Intermediate Testing.

Purpose

The purpose of this document is to:

a) confirm that work on signalling assets is being completed correctly;

b) provide additional assurance of staff competency when working on signalling assets; and

c) assist in gathering evidence to support IRSE licensing processes.


Edition : 6
File Size : 4 files , 2.2 MB
Number of Pages : 14
Published : 06/01/2024

History

NR NR/L2/SIG/10027 ISSUE 6
Published Date: 06/01/2024
Surveillance of Signal Maintenance Activities
$13.2
NR NR/L2/SIG/10027 ISSUE 5
Published Date: 09/03/2022
Surveillance of Signal Maintenance Activities
$13.2
NR NR/L2/SIG/10027 ISSUE 4
Published Date: 12/05/2015
Surveillance of Signal Engineering Activities
$13.2
NR NR/L2/SIG/10027 ISSUE 3
Published Date: 09/03/2011
Surveillance of Signal Engineering Activities
$7.5

Related products

NR NR/L3/MTC/RCS0216/PR03 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Demolition of Structure
$5.7
NR NR/SMTH/PART 01 ISSUE 9
Published Date: 12/02/2023
Signal Maintenance Testing Handbook (SMTH): Part 01
$18.6
NR NR/L2/SIG/19820/L05 ISSUE 1
Published Date: 09/03/2022
Signalling and Level Crossing Product Specifications: Specification for EULYNX - Interlocking to Adjacent Interlocking Subsystem (ILS)
$13.2

Best-Selling Products