NR NR/L2/SIG/11107 ISSUE 4 PDF

NR NR/L2/SIG/11107 ISSUE 4 PDF

Name:
NR NR/L2/SIG/11107 ISSUE 4 PDF

Published Date:
03/03/2012

Status:
[ Active ]

Description:

Silver Migration

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Applies to all relays, plugboards and plug couplers formed of black phenolic material.

Purpose

Silver Migration can lead to wrong side failures.

This standard specifies:

a) The required inspection regime

b) Remedial actions to be taken

c) Competence for staff undertaking inspections

The high risk conditions are also described.


Edition : 4
File Size : 1 file , 610 KB
Number of Pages : 12
Published : 03/03/2012

History


Related products

NR NR/L2/CIV/140/1800N ISSUE 1
Published Date: 06/04/2016
Model Clauses for Civil Engineering Works: Specification for Structural Steelwork
$18.6
NR NR/CIV/SD/1547 ISSUE E
Published Date: 09/02/2017
E-Type Underbridges: Cross Girder & Trimmer: Double Track 25 to 50 Degrees Steel Floor Transverse Rib
$5.7
NR NR/L2/ELP/27009/MOD C45 ISSUE 1
Published Date: 12/03/2011
REPLACEMENT OF ADJUSTABLE 'RAT TRAP' TYPE DROPPER ASSEMBLIES IN BRIDGE APPROACH SPANS
$5.7
NR RT/E/S/10161 ISSUE 1
Published Date: 04/01/2004
Inspection & Surveillance of Signal Engineering Installation Activities (aka NR/SP/SIG/10161)
$18.6

Best-Selling Products

HOLDEN ETPSL0026
Published Date: 11/01/2012
H Point Measurement
$23.4
HOLDEN ETPSL0039
Published Date: 05/01/2012
ADR 21/00 Instrument Panel Impact Test Procedure
$23.4
HOLDEN ETPSL0044
Published Date: 11/01/2012
Demisting of Vehicle Windscreen for Categories MA MC ADR 15
$23.4
HOLDEN ETPSL0101
Published Date: 05/01/2012
Closure Stiffness Testing
$23.4
HOLDEN ETPSLR0008
Published Date: 11/01/2012
Door Weatherstrip Slam Test
$23.4
HOLDEN ETPSLR0061
Published Date: 11/01/2012
Steering Gear Impact Test
$23.4