Name:
NR NR/L2/SIG/11201/MOD A2-20 ISSUE 1 PDF
Published Date:
06/02/2018
Status:
[ Active ]
Publisher:
Network Rail
This module identifies the controls, processes and documentation necessary so that correlation of signalling infrastructure is adequately carried.It does not cover the requirements for correlating the infrastructure to draw a signalling Scheme Base Plan which are covered in NR/L2/SIG/11201 Module A3-3.
Purpose
This module gives guidance on the correlation of signalling records to actual wiring and equipment.
Correlation of signalling records, equipment and wiring on site is necessary to confirm:
a) the accuracy of source records prior to any design alteration; and
b) that records for signalling infrastructure controlled by Network Rail are adequate for maintenance and faulting.
| Edition : | 1 |
| File Size : | 1 file , 390 KB |
| Number of Pages : | 20 |
| Published : | 06/02/2018 |