NR NR/L2/SIG/11400/ER/R/1/0224 ISSUE 1 PDF

NR NR/L2/SIG/11400/ER/R/1/0224 ISSUE 1 PDF

Name:
NR NR/L2/SIG/11400/ER/R/1/0224 ISSUE 1 PDF

Published Date:
06/15/2009

Status:
[ Revised ]

Description:

HPSS Installation Manual: HPSS for Plain Lead Switches (UIC54 & RT60)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-sig-11400-er-r-1-0224-issue-1_2763152

Choose Document Language:
24.30 €
Need Help?
NR/L2/SIG/11400/ER/R/1/0224

Scope of Document

This document describes how to install the current build standards of UIC54 and RT60 HPSS systems, for all approved switch sizes. There are a number of steps that are common to all switch types and sizes; however where there are specific variations relating to a particular switch type / size these are highlighted within the procedures.

Maintenance of the HPSS shall be carried out in accordance Network Rail procedures, and the appropriate SMS documentation.

Purpose

The purpose of this document is to provide comprehensive procedures, including ‘best practice', for the installation and setting-up of the IAD Rail Systems' High Performance Switch System (HPSS). This comprises both the High Performance Switch Actuator (also known as the HPSA) and the PowerLink Backdrive.


Edition : 1
File Size : 1 file , 2.9 MB
Number of Pages : 91
Published : 06/15/2009

History

NR NR/L2/SIG/11400/ER/R/1/0224 ISSUE 2
Published Date: 03/02/2019
HPSS Comprising High Performance Switch Actuator and Powerlink Backdrive
24.30 €
NR NR/L2/SIG/11400/ER/R/1/0224 ISSUE 1
Published Date: 06/15/2009
HPSS Installation Manual: HPSS for Plain Lead Switches (UIC54 & RT60)
24.30 €

Related products

NR E10000/94/15 ISSUE B
Published Date: 10/01/1984
Power Supply - Somerton REB Busbar Fuse Allocation Sheet Nos. Typical
5.70 €
NR NR/L3/OCS/044/FS-39L ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Station Security Plan – Restricted – Security Certificate
5.70 €
NR NR/CIV/SD/404 ISSUE G
Published Date: 06/01/2019
Footbridges Non-Stations: Erection Sequence
5.70 €
NR NR/L2/OPS/031 ISSUE 10
Published Date: 09/07/2019
Assessing and Assuring the Impact of Operational Risks Relating to Changes to the Train Plan
24.30 €

Best-Selling Products

FCI 13-1-2022
Published Date: 2022
Determining Condensate Loads to Size Steam Traps
66.00 €
FCI 15-1-2020
Published Date: 2020
Standard for Production Testing of Pressure Regulators
49.50 €
FCI 17-1-2018
Published Date: 10/01/2018
Standard for Production Testing of Sanitary Pressure Regulators
33.00 €
FCI 18-1-2021
Published Date: 2021
Standard for Sizing and Selection of Type 1 Secondary Pressure Drainers
33.00 €
FCI 18-2-2020
Published Date: 2020
Standard for Installation of Type 1 Secondary Pressure Drainers
33.00 €