Name:
NR NR/L2/SIG/11400/ER/R/1/0224 ISSUE 2 PDF
Published Date:
03/02/2019
Status:
[ Active ]
Publisher:
Network Rail
Scope of Document
This document describes how to install the current build standards of UIC54 and RT60 HPSS systems, for all approved switch sizes. There are a number of steps that are common to all switch types and sizes; however where there are specific variations relating to a particular switch type / size these are highlighted within the procedures.
HPSS testing shall be carried out in accordance with Network Rail procedures as referenced in HPSS Handbook (Ref: 18.1).
This document excludes HPSS maintenance procedures (refer to HPSS Handbook).
This document contains references to manufacturing part numbers, referred to as M/f Pt No., and are for STE-TDT use only.
Scope of Equipment
Specific variants of the HPSS which are covered in this manual are:
• HPSA fitted on UIC54 switches.
• HPSA fitted on RT60 switches
• PowerLink Backdrive fitted on UIC54 and RT60 switches.
Purpose
The purpose of this document is to provide the procedure for the installation and setting-up of the High Performance Switch System (HPSS), comprising the High Performance Switch Actuator (HPSA) and the PowerLink Backdrive.
| Edition : | 2 |
| File Size : | 1 file , 3.9 MB |
| Number of Pages : | 78 |
| Published : | 03/02/2019 |