NR NR/L2/SIG/11766/A040 ISSUE 3 PDF

NR NR/L2/SIG/11766/A040 ISSUE 3 PDF

Name:
NR NR/L2/SIG/11766/A040 ISSUE 3 PDF

Published Date:
01/13/2012

Status:
[ Active ]

Description:

Aster and Aster21 Track Circuit Manual: Modifications to EBI Track 200 TI21 Tuning Unit and ETU T1/T2 Connections and Trackside Wiring Recommendations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-sig-11766-a040-issue-3_2783429

Choose Document Language:
7.50 €
Need Help?
PDF ONLY

INTRODUCTION1

TI21 Tuning Units and ETUs are known to be prone to connection problems at the T1/T2 terminals where the track tails are terminated onto the unit. Investigation has shown that the termination arrangements for the 10mm tail cable crimp can become slack owing to the ‘Back nut’ becoming loose (see Photo 1). The resulting loose connection causes degradation in performance, often leading to right side failure.

For new build Tuning Units and ETUs, Bombardier have altered the terminal arrangement to remove the ‘Back nut’ and these units are identified by mod strike as follows:

New build TU with modification = mod strike 3

New build ETU with modification = mod strike 4

This application note contains:

• Instructions detailing how to modify the terminal arrangement of earlier TUs and ETUs to eliminate the slack back nut problem.

• Recommendations for Tuning Unit trackside wiring which will optimise pole/zero performance

1 The illustrations in this application note are clearest when viewed in colour.


Edition : 3
File Size : 1 file , 510 KB
Number of Pages : 9
Published : 01/13/2012

History


Related products

NR TEF 3274 ISSUE 1
Published Date: 03/07/2020
UTU Investigation Request
5.70 €
NR X70500 ISSUE 2
Published Date: 04/07/2007
MCB Typical Circuits Data Logger Circuits (1)
5.70 €
NR NR/L3/ELP/29987/MOD03 ISSUE 6
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Management of Electrical Risks
13.20 €
NR NR/L3/SIG/20047 ISSUE 3
Published Date: 09/03/2022
Management of Safety Related Reports for Signalling Failures Appendix
24.30 €

Best-Selling Products

USP 01 DSI EC SafetyReview Protocol 2008-07-29
Published Date: 2009
USP Dietary Supplement Safety Review Process
USP 01 Manuf-Sale of Bulk Bot Exts Guidance
Published Date: 2009
Guidance for Manufacture & sale of bulk botanical extracts
USP 01 Marker Compound Guidance
Published Date: 2009
Use of Marker Compounds in Manufacturing and Labeling of Botanically Derived Dietary Supplements
USP 02 2008-04-03 DS GMPs
Published Date: 2009
Good manufacturing practices for dietary supps
USP 02 ASHWAGANDHA SAFETY REVIEW 2008-08-06
Published Date: 2009
USP Safety Review of Ashwaganda
USP 03 05 RetailLabeling
Published Date: 2009
Guidance for the retail labeling of dietary supplements containing soft or powdered botanical extracts