NR NR/L2/SIG/14201 ISSUE 3 PDF

NR NR/L2/SIG/14201 ISSUE 3 PDF

Name:
NR NR/L2/SIG/14201 ISSUE 3 PDF

Published Date:
09/01/2018

Status:
[ Revised ]

Description:

Signalling Risk Assessment Handbook

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-sig-14201-issue-3_2766815

Choose Document Language:
7.50 €
Need Help?
PDF ONLY

This handbook is applicable to those undertaking signalling safety risk assessment where Network Rail is the Infrastructure Manager. They could be either Network Rail employees or appointed contractors/consultants acting on behalf of Network Rail.

This handbook applies for the assessment of signalling safety risk:

a) during the development and implementation of change to Network Rail controlled infrastructure;

b) arising as a result of the operation of trains on Network Rail controlled infrastructure.

The risk assessment of overrun, detailed in this document, only applies to lineside signalling. ETCS will be covered by a separate ETCS overrun risk assessment.

The manual does not include level crossing suitable and sufficient risk assessment which is subject to operations standards.

Risk assessments in support of deviations should be addressed in in the noncompliance application and certification process.

Purpose

This manual provides a framework for consistent production of suitable and sufficient risk assessments for the Signalling system.

It sets out the procedures and the specification of tools that Network Rail uses to comply with published standards requiring signalling risk assessment.


Edition : 3
File Size : 1 file , 580 KB
Number of Pages : 9
Published : 09/01/2018

History

NR NR/L2/SIG/14201 ISSUE 5
Published Date: 12/05/2020
Signalling Risk Assessment Handbook
7.50 €
NR NR/L2/SIG/14201 ISSUE 4
Published Date: 03/02/2019
Signalling Risk Assessment Handbook
7.50 €
NR NR/L2/SIG/14201 ISSUE 3
Published Date: 09/01/2018
Signalling Risk Assessment Handbook
7.50 €
NR NR/L2/SIG/14201 ISSUE 2
Published Date: 08/26/2008
Prevention and Mitigation of Overruns
18.60 €

Related products

NR NR/OP/SCEP ISSUE 1
Published Date: 07/31/2020
Status of Standards Challenge Applications
5.70 €
NR BRS-SM 3023/1&2 ISSUE A
Published Date: 02/07/2014
IBCL Point Layout NR56 BVS Layout Mechanical Supplementary Drive Mounted External to 4 - Foot
5.70 €
NR NR/L2/MTC/SE0117 ISSUE 4
Published Date: 09/01/2018
Planned Assurance Inspections and Site Surveillance
13.20 €
NR BRS-SM 2410 ISSUE B
Published Date: 01/11/1994
SGE EP Point Machine Fittings Lock Bar Assembly for UIC-54B Plain Leads
5.70 €

Best-Selling Products

ECMA 100
Published Date: 12/01/1988
Data Interchange on 90mm Flexible Disk Cartridges Using MFM Recording at 7 958 ftprad on 80 Tracks on Each Side-ISO Type 301, Second Edition
ECMA 102
Published Date: 07/01/1987
Rate Adaptation for the Support of Synchronous and Asynchronous Equipment Using the V. Series Type Interface on a PCSN, Second Edition
ECMA 106
Published Date: 12/01/1993
PTN - Signaling Protocol at the S Reference Point - Circuit Mode Basic Services (SSIG-BC), Third Edition
5.40 €
ECMA 107
Published Date: 06/01/1995
Volume and File Structure of Disk Cartridges for Information Interchange, Second Edition
5.40 €
ECMA 108
Published Date: 12/01/1996
Measurement of High-frequency Noise emitted by Information Technology and Telecommunications Equipment, Third Edition
5.40 €
ECMA 109
Published Date: 12/01/1996
Declared Noise Emission Values of Information Technology and Telecommunications Equipment
5.40 €