NR NR/L2/SIG/14201 ISSUE 4 PDF

NR NR/L2/SIG/14201 ISSUE 4 PDF

Name:
NR NR/L2/SIG/14201 ISSUE 4 PDF

Published Date:
03/02/2019

Status:
[ Revised ]

Description:

Signalling Risk Assessment Handbook

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This handbook is applicable to those undertaking signalling safety risk assessment where Network Rail is the Infrastructure Manager. They could be either Network Rail employees or appointed contractors/consultants acting on behalf of Network Rail.

This handbook applies for the assessment of signalling safety risk:

a) during the development and implementation of change to Network Rail controlled infrastructure;

b) arising as a result of the operation of trains on Network Rail controlled infrastructure.

The risk assessment of overrun, detailed in this document, only applies to lineside signalling. ETCS will be covered by a separate ETCS overrun risk assessment.

The manual does not include level crossing suitable and sufficient risk assessment which is subject to operations standards.

Risk assessments in support of deviations should be addressed in in the noncompliance application and certification process.

Purpose

This manual provides a framework for consistent production of suitable and sufficient risk assessments for the Signalling system.

It sets out the procedures and the specification of tools that Network Rail uses to comply with published standards requiring signalling risk assessment.


Edition : 4
File Size : 1 file , 620 KB
Number of Pages : 9
Published : 03/02/2019

History

NR NR/L2/SIG/14201 ISSUE 5
Published Date: 12/05/2020
Signalling Risk Assessment Handbook
$7.5
NR NR/L2/SIG/14201 ISSUE 4
Published Date: 03/02/2019
Signalling Risk Assessment Handbook
$7.5
NR NR/L2/SIG/14201 ISSUE 3
Published Date: 09/01/2018
Signalling Risk Assessment Handbook
$7.5
NR NR/L2/SIG/14201 ISSUE 2
Published Date: 08/26/2008
Prevention and Mitigation of Overruns
$18.6

Related products

NR BRS-SM 2247/1
Published Date: 03/15/1990
Rail Clamp Point Lock Sandite Shield
$5.7
NR BRS-SM 81/2 ISSUE A
Published Date: 03/20/1972
Colour Light Signals Fixing Bolts & Screws for Junction Indicators Fixed to C/L Signals
$5.7
NR NR/L2/SIG/30014/D120/TS11-01 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing: Control Tables and Principles Testing Work Test Specification
$7.5
NR NR/L2/SIG/30015 ISSUE 1
Published Date: 03/06/2010
Specification for Station, Footpath, Bridleway & User Worked Level Crossings
$24.3

Best-Selling Products

IDEA CL-2-2017
Published Date: 07/01/2017
IDW Attribute Value Guideline v05.05