Name:
NR NR/L2/SIG/14201/MOD01 ISSUE 2 PDF
Published Date:
12/05/2020
Status:
[ Active ]
Publisher:
Network Rail
This module applies to those undertaking signal overrun risk assessment where Network Rail is the Infrastructure Manager. They could be either Network Rail employees or appointed contractors/consultants acting on behalf of Network Rail.
This module applies for the assessment of signal overrun risk:
a) during the development and implementation of change to Network Rail controlled infrastructure;
b) arising as a result of the operation of trains on Network Rail controlled infrastructure.
Purpose
This module defines the process and tools that Network Rail uses to comply with RIS-0386-CCS. It provides: a) a structured, clear and consistent approach to signal overrun risk assessment on Network Rail controlled infrastructure; b) appropriate strategies, tools, and techniques to be applied under the variety of operational and developmental situations that lead to a requirement for a signal overrun risk assessment to be undertaken.
Network Rail’s Signal Overrun Risk Assessment (SORA) process is the means by which Network Rail discharges its responsibilities to undertake a suitable and sufficient risk assessment of risk arising from signals passed at danger due to train driver error (Category A SPAD).
| Edition : | 2 |
| File Size : | 1 file , 300 KB |
| Number of Pages : | 21 |
| Published : | 12/05/2020 |