NR NR/L2/SIG/30009/A060 ISSUE 1 PDF

NR NR/L2/SIG/30009/A060 ISSUE 1 PDF

Name:
NR NR/L2/SIG/30009/A060 ISSUE 1 PDF

Published Date:
12/05/2020

Status:
[ Revised ]

Description:

Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Common Principles

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module primarily reflects multiple aspect signalling to which Track Circuit Block Regulations apply, controlled from a route setting panel or VDU system. The concepts also apply to other interlocking and block systems. Any significantly different / additional considerations to other forms of signalling are specifically identified.

This Module and those directly associated with it equally apply to railway which is ETCS fitted unless there are no applicable lineside signals.

NOTE: The principles appropriate to Modular Signalling are as specified within the functional requirements of NR/L2/SIG/30097/Appx C which references those standards extant in April 2014 and therefore is not affected by the publication of this module.

This module applies to all command and control equipments (see the typical listing in Section 1.1C1.2) for new provision and, subject to consideration of "using reasonable opportunity" and practicability, all alterations to signalling where the changes appreciably alter the risk associated with the layout and with any of the signals within the scheme.

Changes to layout risk are likely when any of the following apply:

a) alterations are made to a layout;

b) lines become designated as passenger;

c) layouts are re-signalled or relocked (or re-controlled, though it is recognised that the opportunity to mitigate existing risk is generally limited);

d) additional routes are provided;

e) platforms are added;

f) permissible or attainable speeds are changed, whether raised or lowered;

g) an overrun or timetable risk assessment (or similar) identifies the need to review protection.

Where the content of application standards (such as NR/L2/SIG/11201, SSI8003, NR/GN/SIG/CAT0005) are different to the requirements described in this standard this standard takes precedence.

Purpose

This module forms part of the Signalling Principles Handbook (NR/L2/SIG/30009) and is to be read in conjunction with the other modules of the handbook.

The SPH details Network Rail’s requirements for the provision of functional logic between signals, movable infrastructure such as points and other parts of the signalling system to control the risk of:

a) failure of moving infrastructure to establish a wheeled path;

b) collision between a train and another train legitimately present;

c) the issuing of a movement authority to the train driver and its subsequent removal.

The SPH comprises mandatory sections and guidance. The guidance is to be followed unless an alternative can be demonstrated to be beneficial and no less safe. It satisfies the relevant parts of the IRSE Fundamental Requirements for Train Control Systems, see Appendix 1 for extract.


Edition : 1
File Size : 1 file , 460 KB
Number of Pages : 26
Published : 12/05/2020

History

NR NR/L2/SIG/30009/A060 ISSUE 4
Published Date: 09/07/2024
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Common Principles
$18.6
NR NR/L2/SIG/30009/A060 ISSUE 3
Published Date: 12/02/2023
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Common Principles - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L2/SIG/30009/A060 ISSUE 2
Published Date: 12/03/2022
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Common Principles
$18.6
NR NR/L2/SIG/30009/A060 ISSUE 1
Published Date: 12/05/2020
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Common Principles
$18.6

Related products

NR E10000/0/3B ISSUE A
Published Date: 10/28/1992
Typical Circuits Capacitor Time Delay (2)
$5.7
NR NR/L2/TEL/30150 ISSUE 1
Published Date: 09/04/2010
Telecom Infrastructure Decision Support Tool Handbook
$13.2
NR NR/L3/MTC/RCS0216/MP06 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Lifting & Thimbling Operations
$5.7
NR E10016/10 ISSUE 2
Published Date: 09/01/2004
Typical Circuits Point Machines Drive Circuits for New Installations or where Conversion Made from Clamp Lock
$5.7

Best-Selling Products

Human Resource Management
Published Date: 07/20/1999