NR NR/L2/SIG/30009/A060 ISSUE 3 PDF

NR NR/L2/SIG/30009/A060 ISSUE 3 PDF

Name:
NR NR/L2/SIG/30009/A060 ISSUE 3 PDF

Published Date:
12/02/2023

Status:
[ Not for New Design ]

Description:

Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Common Principles - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module primarily reflects multiple aspect signalling to which Track Circuit Block Regulations apply, controlled from a route setting panel or VDU system. The concepts also apply to other interlocking and block systems. Any significantly different / additional considerations to other forms of signalling are specifically identified.

This Module and those directly associated with it equally apply to railway which is ETCS fitted unless there are no applicable lineside signals.

NOTE: The principles appropriate to Modular Signalling are as specified within the functional requirements of NR/L2/SIG/30097/Appx C which references those standards extant in April 2014 and therefore is not affected by the publication of this module.

This module applies to all command and control equipments (see the typical listing in Section 1.1C1.2) for new provision and, subject to consideration of "using reasonable opportunity" and practicability, all alterations to signalling where the changes appreciably alter the risk associated with the layout and with any of the signals within the scheme.

Changes to layout risk are likely when any of the following apply:

a) alterations are made to a layout;

b) lines become designated as passenger;

c) layouts are re-signalled or relocked (or re-controlled, though it is recognised that the opportunity to mitigate existing risk is generally limited);

d) additional routes are provided;

e) platforms are added;

f) permissible or attainable speeds are changed, whether raised or lowered;

g) an overrun or timetable risk assessment (or similar) identifies the need to review protection.

Where the content of application standards (such as NR/L2/SIG/11201, SSI8003, NR/GN/SIG/ CAT0005) are different to the requirements described in this standard this standard takes precedence.  

Purpose

This module forms part of the Signalling Principles Handbook (NR/L2/SIG/30009) and is to be read in conjunction with the other modules of the handbook.

The SPH details Network Rail’s requirements for the provision of functional logic between signals, movable infrastructure such as points and other parts of the signalling system to control the risk of:

a) failure of moving infrastructure to establish a wheeled path;

b) collision between a train and another train legitimately present;

c) the issuing of a movement authority to the train driver and its subsequent removal.

The SPH comprises mandatory sections and guidance. The guidance is to be followed unless an alternative can be demonstrated to be beneficial and no less safe. It satisfies the relevant parts of the IRSE Fundamental Requirements for Train Control Systems, see Appendix 1 for extract.


Edition : 3
File Size : 2 files , 9.7 MB
Number of Pages : 31
Published : 12/02/2023

History

NR NR/L2/SIG/30009/A060 ISSUE 4
Published Date: 09/07/2024
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Common Principles
$18.6
NR NR/L2/SIG/30009/A060 ISSUE 3
Published Date: 12/02/2023
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Common Principles - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L2/SIG/30009/A060 ISSUE 2
Published Date: 12/03/2022
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Common Principles
$18.6
NR NR/L2/SIG/30009/A060 ISSUE 1
Published Date: 12/05/2020
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Common Principles
$18.6

Related products

NR BRS-SM 440/C4 ISSUE B
Published Date: 08/04/1994
Signalling Equipment Framework Short Transverse Tie Bar for REB's
$5.7
NR E10000/11/21 ISSUE A
Published Date: 09/01/1994
Track Circuits - Treadle Backup in TCB Area 2 Dis. Box Arrangement
$5.7
NR NR/CIV/SD/FORMA/262 ISSUE B
Published Date: 06/03/2009
Form A:Underbridges - Walkway Details
$18.6
NR NR/L2/SIG/30014/D120/TS6-35 ISSUE 5
Published Date: 06/05/2021
Signalling Works Testing: In Bearer Clamp Lock (IBCL) Signalling Works Test Specification
$7.5

Best-Selling Products

SN-ISO/IEC Guide 14:2018
Published Date: 07/13/2018
Products and related services — Information for consumers
SN-ISO/IEC Guide 41:2018
Published Date: 11/01/2018
Packaging — Recommendations for addressing consumer needs
SN-ISO/IEC Guide 71:2001
Published Date: 11/20/2002
Guidelines for standards developers to address the needs of older persons and persons with disabilities
SN-ISO/IEC Guide 73:2002
Published Date: 05/01/2006
Risk management — Vocabulary — Guidelines for use in standards
SN-ISO/IEC Guide 76:2008
Published Date: 01/16/2008
Development of service standards — Recommendations for addressing consumer issues
SN-ISO/IEC Guide 98-6:2021
Published Date: 03/22/2021
Uncertainty of measurement — Part 6: Developing and using measurement models